Safety Assistant
Powered by SALUSIQ
RESEARCH

Create a safety checklist for construction site setup

Generated on: April 13, 2025

Construction Site Setup Safety Checklist

Purpose: Ensure a safe and compliant setup of a construction site.

Instructions: Use this checklist to verify that all safety measures are in place before commencing construction activities. Mark each item as complete or incomplete. Note any corrective actions required.

1. Site Preparation

  • Site Cleanliness: Ensure the site is clean and free from materials or equipment that could cause slips or trips [1].
  • Access Roads: Verify that access roads are adequate for safe delivery and movement of equipment and materials [2].
  • Barricades: Install barricades to prevent unauthorized access to hazardous areas [3].

2. Lighting

  • Adequate Lighting: Ensure sufficient lighting for safe work [1].
  • Emergency Lighting: Verify emergency lighting is in place and functional [1].

3. Equipment and Material Handling

  • Secure Storage: Ensure materials and equipment are stored securely to prevent dislodging or movement [4].
  • Pallets and Racks: Check that pallets and storage racks are used and maintained properly [1].

4. Structural Safety

  • Bracing and Supports: Ensure all temporary structures are adequately braced and supported [5].
  • Skeleton Structures: Verify that erection drawings and procedures are certified by a professional engineer [4].

5. Safety Signage and Signals

  • Signage: Post clear safety signs and signals as required [3].
  • Designated Signallers: Ensure competent workers are designated for signaling duties [4].

6. Fire Prevention

  • Fuel and Oil Safety: Store fuel and oil safely and ensure no smoking or open flames near these materials [6].
  • Electrical Safety: Inspect electrical wiring for damage and secure all connections [6].

7. Personal Protective Equipment (PPE)

  • PPE Availability: Ensure all workers have access to necessary PPE and are trained in its use [7].

8. Emergency Preparedness

  • Emergency Procedures: Verify that emergency procedures are in place and communicated to all workers [7].

Notes/Comments:


Corrective Actions Required:


Prepared by:

  • Name: __________________________
  • Date: __________________________

Signature:



Important Safety Note:

Always verify safety information with your organization's specific guidelines and local regulations.

References

Page links are approximate
[1]↑

Occupational Health and Safety Code

Open Document

Page 123

[2]↑

Rules for the Administration of the Oregon Safe Employment Act (Construction, Division 3, OSHA Oregon)

Open Document

Page 803

[3]↑

Kobelco SK235SR-2, SK235SRLC-2 Operation Manual

Open Document

Page 33

[4]↑

Occupational Health and Safety Code

Open Document

Page 124

[5]↑

Occupational Safety General Regulations (N.S. Reg. 44/99)

Open Document

Page 86

[6]↑

Kobelco SK235SR-2, SK235SRLC-2 Operation Manual

Open Document

Page 35

[7]↑

Spider by Brand Safway: Swing Stage Operator’s Manual

Open Document

Page 3

AI Safety Tools

  • Toolbox Talks
  • Pre-Task Plans
  • Risk Assessments
  • Safe Work Procedures
  • Safety Checklists

Company

  • About
  • Contact
  • Terms of Service
  • Privacy Policy

© 2026 SALUS Safety. All rights reserved.

< for the nerds />
Assistant
History
DocumentsLabs