Construction Site Setup Safety Checklist

This checklist is designed to ensure a safe setup of a construction site before work begins. Complete each item and address any deficiencies before starting work.

I. General Site Conditions

  • Housekeeping: Work site is clean and free from slip or trip hazards [1].
    • Corrective Actions:
  • Lighting: Sufficient lighting is provided to enable safe work [1].
    • Corrective Actions:
  • Emergency Lighting: Emergency lighting is available in case of power failure [1].
    • Corrective Actions:
  • Signage: Warning signs are posted to prohibit unauthorized persons from operating potentially hazardous equipment [2].
    • Corrective Actions:

II. Equipment and Materials

  • Pallets: Pallets are loaded, moved, stacked, arranged, and stored safely [1].
    • Corrective Actions:
  • Storage Racks: Racks are designed, constructed, and maintained to support the load and placed on firm foundations [1].
    • Corrective Actions:
  • Material Storage: Supplies and roofing materials are stored at least 2 meters from the roof edge on residential buildings under construction [1].
    • Corrective Actions:
  • Material Weight Distribution: Weight of supplies and roofing materials is uniformly distributed [1].
    • Corrective Actions:
  • Hoses and Piping: Hoses and piping operating under pressure are restrained [3].
    • Corrective Actions:
  • Securing Equipment and Materials: Equipment and materials are contained, restrained, or protected to eliminate potential dangers [3].
    • Corrective Actions:

III. Excavation Safety

  • Underground Utilities: Underground utilities are located and marked before excavation begins.
    • Corrective Actions:
  • Excavation Protection: Excavations are protected from collapse using shoring, sloping, or benching systems.
    • Corrective Actions:
  • Egress: Safe access and egress are provided for all excavations.
    • Corrective Actions:

IV. Scaffold Safety

  • Scaffold Inspection: Scaffold components are inspected for damage, corrosion, and missing parts [4].
    • Corrective Actions:
  • Guardrails: Guardrails, midrails, and toeboards are installed on all scaffolds [4].
    • Corrective Actions:
  • Fall Protection: Workers on scaffolds use safety lines and harnesses [4].
    • Corrective Actions:

V. Electrical Safety

  • Power Lines: Survey the job site for hazards such as exposed electrical wires [5].
    • Corrective Actions:
  • Grounding: All electrical power sources and power cord connections are grounded [6].
    • Corrective Actions:
  • Cords: Use power cords of proper size that are long enough for the job [6].
    • Corrective Actions:

VI. Mobile Equipment Safety

  • Pre-Operation Check: Check that all protective guard and cover, and mirror are installed properly [7].
    • Corrective Actions:
  • Tag Out: Post to the operators controls a "DO NOT OPERATE" tag to warn persons not to start the machine during maintenance [7].
    • Corrective Actions:
  • Work Area: Know the work area! Before operating the machine, carefully survey and record the land and worksite features to prevent the machine from falling or the soil from caving in [7].
    • Corrective Actions:
  • Safety Lock: Engage safety lock lever before leaving machine [7].
    • Corrective Actions:
  • Signal Person: Use a signal person and a flagman [8].
    • Corrective Actions:

VII. Fire Prevention

  • Flammables: Do not smoke close to the area and do not use the fire near the area [9].
    • Corrective Actions:
  • Fueling: Make up shortage of fuel after stopping the engine [9].
    • Corrective Actions:
  • Spills: After refueling and lubrication, wipe off the spilled out fuel and oil, etc. immediately [9].
    • Corrective Actions:
  • Work Lights: Use only approved work lights when performing inspection and maintenance procedures to prevent possible fire or explosion [9].
    • Corrective Actions:

VIII. Structural Stability

  • Bracing and Supports: Work is completed on any component designed to support or give added support to a part of the project before proceeding with any work that adds to the load on that part [10].
    • Corrective Actions:
  • Wall Bracing: A free standing wall of brick, concrete blocks or similar materials greater than 2 m in height is braced from both sides until the wall is attached to a rigid structure and the mortar has set adequately [10].
    • Corrective Actions:

IX. Inspections and Reporting

  • Regular Inspections: Frequent and regular inspections of the job sites, materials, and equipment to be made by competent persons designated by the employers [4].
    • Corrective Actions:
  • Reporting: Any employee having knowledge of the existence of any unsafe device, practice, operation, safeguard, equipment, or condition shall promptly report it to the supervisor or person in charge [11].
    • Corrective Actions:

Signatures

Inspector: _________________________ Date: ______________

Supervisor: _________________________ Date: ______________


Important Safety Note:

Always verify safety information with your organization's specific guidelines and local regulations.

References

Page links are approximate
[1]↑

Occupational Health and Safety Code

Open Document

Page 123

[2]↑

HIOSH Construction Standards: Occupational Safety and Health (12-8-3)

Open Document

Page 10

[3]↑

Occupational Health and Safety Code

Open Document

Page 124

[4]↑

Spider by Brand Safway: Swing Stage Operator’s Manual

Open Document

Page 3

[5]↑

Spider by Brand Safway: Swing Stage Operator’s Manual

Open Document

Page 5

[6]↑

Spider by Brand Safway: Swing Stage Operator’s Manual

Open Document

Page 6

[7]↑

Kobelco SK235SR-2, SK235SRLC-2 Operation Manual

Open Document

Page 33

[8]↑

Kobelco SK500XSLC-10, SK520XDLC-10 Operation Manual

Open Document

Page 60

[9]↑

Kobelco SK235SR-2, SK235SRLC-2 Operation Manual

Open Document

Page 35

[10]↑

Occupational Safety General Regulations (N.S. Reg. 44/99)

Open Document

Page 86

[11]↑

HIOSH Construction Standards: Occupational Safety and Health (12-8-3)

Open Document

Page 9

AI Safety Tools

  • Toolbox Talks
  • Pre-Task Plans
  • Risk Assessments
  • Safe Work Procedures
  • Safety Checklists