Create a pre-task plan for scaffold assembly
Generated on: April 18, 2025
Pre-Task Plan: Scaffold Assembly
Date: [DATE] Work Area: [WORK AREA] Task Supervisor: [SUPERVISOR NAME]
1. Task Description
Assemble a tubular welded frame scaffold for construction work, ensuring compliance with safety standards and regulations.
2. Task Duration
Estimated Start: [START TIME] Estimated Completion: [END TIME]
3. Personnel Involved
- Scaffold Erector
- Safety Officer
- Construction Worker
4. Task-Specific Hazards and Controls
| Hazard | Risk | Control Measures |
|---|---|---|
| Falls from height | Serious injury or fatality | Use fall protection systems such as guardrails and personal fall arrest systems [1][2]. |
| Scaffold collapse | Serious injury or fatality | Ensure scaffold is erected on a stable foundation and is properly braced and tied [3][4]. |
| Falling objects | Injury to workers below | Install toeboards and screens on scaffolds to prevent objects from falling [1][2]. |
5. Required PPE for Today's Task
- Hard hats
- Safety harness with lanyard
- Steel-toed boots
6. Tools and Equipment Needed
- Scaffold components (frames, braces, planks)
- Wrenches and hammers
- Personal fall arrest systems
7. Pre-Start Checklist
Area Preparation
- Ensure the ground is level and stable for scaffold erection.
- Clear the area of debris and obstructions.
- Mark the work area with warning signs.
Equipment Checks
- Inspect all scaffold components for damage or defects [3].
- Verify that all fall protection equipment is in good condition [5].
- Ensure all tools are in working order.
Communication
- Brief all personnel on the task and safety measures.
- Establish a communication plan for emergencies.
8. Task Steps Overview
- Inspect and prepare the work area.
- Assemble the base of the scaffold and ensure it is level.
- Erect the scaffold frame and secure with braces.
- Install guardrails and toeboards.
- Conduct a final inspection before use.
9. Emergency Response for This Task
- Fall incident → Administer first aid and call emergency services.
- Scaffold collapse → Evacuate the area and call emergency services.
10. Task-Specific Precautions
- Do not overload the scaffold beyond its capacity [3].
- Ensure all workers are trained in scaffold safety [6].
- Avoid working on the scaffold during high winds or storms [7].
Pre-Task Briefing Confirmation
All workers understand the task, associated hazards, and required controls.
Team Lead Initials: [___] Date: [DATE] Time: [TIME]
Safety powered by SALUS
Important Safety Note:
Always verify safety information with your organization's specific guidelines and local regulations.
References
Page links are approximate[1]↑
Safety Standards for General Safety and Health Standards (Chaper 296-24 WAC)
Open DocumentPage 377
[6]↑
Rules for the Administration of the Oregon Safe Employment Act (Construction, Division 3, OSHA Oregon)
Open DocumentPage 556