Pre-Task Plan: Duct Bank Installation
Date: [DATE] Work Area: [WORK AREA] Task Supervisor: [SUPERVISOR NAME]
1. Task Description
Installation of a duct bank, including handling and sealing ductwork [1], and potential blacktop repair [2].
2. Task Duration
Estimated Start: [START TIME] Estimated Completion: [END TIME]
3. Personnel Involved
- Duct Installer
- Assistant
- Supervisor
4. Task-Specific Hazards and Controls
Hazard | Risk | Control Measures |
---|---|---|
Skin Contact with Sealants/Adhesives | Irritation, dermatitis 1, 3 | Wear suitable waterproof gloves and protective clothing [3]. Wash hands thoroughly after handling [2]. |
Dust Inhalation from Materials | Respiratory irritation 1, 11 | Use a NIOSH-approved dust mask or filtering facepiece, especially when cutting or grinding materials 4, 7. Ensure good ventilation [3]. |
Eye Contact with Dust/Sealants | Eye irritation, discomfort 1, 3 | Wear safety glasses with side shields or goggles 7, 9. |
Slips, Trips, and Falls | Injuries | Maintain a clean work area. Clean up spills immediately. Ensure proper housekeeping to prevent accumulation of dusts on surfaces [4]. |
Exposure to blacktop repair fumes | Respiratory irritation, dizziness | Use only outdoors or in a well-ventilated area [2]. |
Incompatible materials | Dangerous reactions | Wet cement is alkaline and incompatible with acid, ammonium salts and aluminum metal. Oxidizing agent [5]. |
5. Required PPE for Today's Task
- Safety Glasses/Goggles 7, 9
- Waterproof Gloves [3]
- Protective Clothing [3]
- NIOSH-approved Dust Mask/Respirator 4, 7
6. Tools and Equipment Needed
- Cutting Tools
- Sealant Applicator
- Measuring Tape
- Hand Tools
7. Pre-Start Checklist
Area Preparation
- Ensure adequate ventilation in the work area [3].
- Clear the work area of obstructions and tripping hazards.
- Set up warning signs and barriers as needed.
Equipment Checks
- Inspect all tools and equipment for proper functioning.
- Verify that all PPE is available and in good condition.
- Check sealant and adhesive expiration dates.
Communication
- Review task steps and potential hazards with all personnel.
- Establish clear communication signals and methods.
8. Task Steps Overview
- Prepare the area for duct bank installation.
- Measure and cut ductwork as needed [4].
- Apply sealant to joints and connections [1].
- Install and secure the duct bank.
- Perform blacktop repairs if necessary [2].
9. Emergency Response for This Task
- Eye Contact → Flush eyes with water for at least 15 minutes 3, 11.
- Skin Contact → Wash affected area with soap and water [6].
- Inhalation → Move to fresh air [6].
10. Task-Specific Precautions
- Avoid generating dust during cutting or grinding [4].
- Keep the product in its package until use [4].
- Do not eat, drink, or smoke in the work area [3].
Pre-Task Briefing Confirmation
All workers understand the task, associated hazards, and required controls.
Team Lead Initials: [___] Date: [DATE] Time: [TIME]