carpet installation
Generated on: April 29, 2025
Pre-Task Plan: Carpet Installation
Date: [DATE] Work Area: [WORK AREA] Task Supervisor: [SUPERVISOR NAME]
1. Task Description
Installation of carpet flooring in designated areas, including preparation of the subfloor, cutting carpet to size, and securing it in place.
2. Task Duration
Estimated Start: [START TIME] Estimated Completion: [END TIME]
3. Personnel Involved
- Carpet Installer
- Helper
- Supervisor
4. Task-Specific Hazards and Controls
Hazard | Risk | Control Measures |
---|---|---|
Wet floors | Slipping hazard | Use matting or grating to eliminate slipping hazards and provide non-slip footwear to employees [1]. |
Sharp tools (e.g., carpet knives) | Cuts and lacerations | Ensure all personnel are trained in the safe use of cutting tools and wear cut-resistant gloves. |
Heavy lifting | Strains and sprains | Use proper lifting techniques and mechanical aids where possible. |
5. Required PPE for Today's Task
- Non-slip footwear
- Cut-resistant gloves
- Safety glasses
6. Tools and Equipment Needed
- Carpet knife
- Knee pads
- Carpet stretcher
7. Pre-Start Checklist
Area Preparation
- Ensure the work area is clear of debris.
- Verify that the subfloor is dry and clean.
- Set up warning signs around the work area.
Equipment Checks
- Inspect all cutting tools for damage.
- Ensure all PPE is available and in good condition.
- Check that all lifting aids are functioning properly.
Communication
- Confirm all team members understand the task and safety procedures.
- Establish a communication plan for emergencies.
8. Task Steps Overview
- Prepare the subfloor by cleaning and drying it.
- Measure and cut the carpet to fit the designated area.
- Lay the carpet and secure it using appropriate adhesives or tack strips.
- Trim excess carpet and ensure edges are secure.
- Conduct a final inspection to ensure the carpet is properly installed.
9. Emergency Response for This Task
- Slip or fall → Administer first aid and call for medical assistance if necessary.
- Severe cut or laceration → Apply pressure to stop bleeding and seek immediate medical attention.
10. Task-Specific Precautions
- Ensure all personnel are aware of the location of first aid kits.
- Maintain clear access to exits and emergency equipment.
- Regularly check the work area for new hazards.
Pre-Task Briefing Confirmation
All workers understand the task, associated hazards, and required controls.
Team Lead Initials: [___] Date: [DATE] Time: [TIME]
Safety powered by SALUS
Important Safety Note:
Always verify safety information with your organization's specific guidelines and local regulations.