Safety Assistant
Powered by SALUSIQ
  • Terms of Service
  • Privacy Policy
  • Safety powered by SALUS
Safety Assistant
Powered by SALUSIQ
Create a safety checklist for boom/scissor lifts
Generated on: April 11, 2025

Boom/Scissor Lift Safety Checklist

Purpose

This checklist is designed to ensure the safe operation of boom and scissor lifts by identifying potential hazards and verifying compliance with safety standards.

Instructions for Use

  • Complete this checklist before operating the lift.
  • Mark each item as complete/incomplete.
  • Note any corrective actions required.
  • Ensure all operators are trained and authorized.

Pre-Operation Checks

  • Manufacturer's Manual: Ensure the manufacturer's operating manual is present with the equipment and all instructions are followed [1].
  • Fall Protection: Verify that personal fall protection systems are used and comply with relevant standards [1].
  • Load Limits: Confirm that boom and basket load limits specified by the manufacturer are not exceeded [2].
  • Brakes and Outriggers: Ensure brakes are set and outriggers are positioned on pads or a solid surface. Install wheel chocks if on an incline [2].
  • Inspection: Conduct a visual inspection of the lift for any damage or wear. Report and repair any issues before use.

Operation Checks

  • Operator Position: Ensure operators stand firmly on the floor of the basket and do not sit or climb on the edge [2].
  • Control Systems: Verify that both platform (upper) and lower controls are functional and clearly marked [2].
  • Movement: Do not move the lift with the boom elevated unless specifically designed for such operation [2].
  • Environment: Check for overhead obstructions and ensure the area is clear of personnel before operation.

Post-Operation Checks

  • Boom Position: Inspect the boom to ensure it is properly cradled and outriggers are in the stowed position before moving the lift for travel [2].
  • Documentation: Record any incidents or near misses and report them to the safety officer.

Corrective Actions

  • Notes/Comments: Document any issues found during the inspection and the corrective actions taken.

Signature

  • Operator Name: _______________________
  • Date: _______________________________
  • Supervisor Approval: __________________

References

  • ANSI/SIA A92.5-1992 for boom lifts and ANSI/SIA A92.6-1990 for scissor lifts [1].

This checklist is based on the Oregon Safe Employment Act and relevant ANSI standards to ensure compliance and safety during lift operations.


Important Safety Note:

Always verify safety information with your organization's specific guidelines and local regulations.

References

Page links are approximate
[1]↑

Rules for the Administration of the Oregon Safe Employment Act (Construction, Division 3, OSHA Oregon)

Open Document

Page 555

[2]↑

Rules for the Administration of the Oregon Safe Employment Act (Construction, Division 3, OSHA Oregon)

Open Document

Page 553

  • Terms of Service
  • Privacy Policy
  • Safety powered by SALUS