Toolbox Talk: Safe Work Procedure for Cricket Lift Over Process Unit

Date: [DATE] Duration: [DURATION] minutes Presenter: [PRESENTER NAME] Location: [LOCATION]

Objective

To ensure all personnel understand and follow the correct safety procedures when using a cricket lift to move materials over a process unit, minimizing the risk of injury and damage.

Introduction

Moving materials over process units using a cricket lift presents significant hazards. This toolbox talk will cover the necessary precautions and procedures to perform this task safely. Recent incidents highlight the importance of adhering to these guidelines to prevent accidents and ensure everyone's safety.

Presenter Note: Engage the audience by asking if anyone has personal experience related to the topic.

Key Points

  • Proper Planning: Assess the load, path, and environment before starting the lift.
  • Equipment Inspection: Ensure the cricket lift and all rigging are in good working condition.
  • Communication: Maintain clear communication between all team members throughout the process.
  • Load Stability: Secure the load properly to prevent shifting or falling during the lift.
  • Controlled Movement: Move the load slowly and deliberately, avoiding sudden stops or starts.

Hazard Identification

  • Falling Objects: Materials may fall if not properly secured, causing injury to personnel below.
  • Structural Failure: Overloading the cricket lift can lead to equipment failure and potential collapse.
  • Contact with Process Unit: Striking the process unit can cause damage to equipment and potential release of hazardous materials.
  • Pinch Points: Body parts can be caught between the load and the surrounding structures.
  • Slips, Trips, and Falls: Unsecured walkways or obstructions can lead to personnel falling.

Presenter Note: Encourage participants to share any additional hazards they've encountered.

Control Measures

  • Elimination: If possible, eliminate the need to lift materials over the process unit by finding an alternative route or method.
  • Engineering Controls: Use a cricket lift with appropriate load capacity and safety features such as overload protection.
  • Administrative Controls: Develop a detailed lift plan, conduct a pre-lift meeting, and assign specific roles to personnel involved.
  • Personal Protective Equipment: All personnel must wear hard hats, safety glasses, gloves, and steel-toed boots.

Safe Work Procedures

  1. Pre-Lift Inspection: Inspect the cricket lift, rigging, and load for any defects or issues.
  2. Load Securing: Ensure the load is properly secured with appropriate straps, chains, or other securing devices.
  3. Path Clearance: Clear the path of any obstructions and ensure adequate lighting.
  4. Controlled Lift: Slowly and carefully lift the load, maintaining constant communication between the operator and spotter.
  5. Safe Placement: Gently lower the load into its final position, ensuring it is stable and secure.

Presenter Note: If possible, demonstrate the safe work procedure or use visual aids.

Personal Protective Equipment (PPE) Requirements

  • Hard Hats: Must be worn at all times to protect against falling objects.
  • Safety Glasses: Required to protect eyes from dust and debris [1].
  • Gloves: Use chemical-resistant, impervious gloves complying with an approved standard should be worn at all times when handling chemical products if a risk assessment indicates this is necessary [2].
  • Steel-Toed Boots: Essential for protecting feet from impact and compression hazards.

[Emphasize the importance of proper PPE use and maintenance]

Real-World Example or Case Study

[Provide a detailed description of a relevant real-world scenario or case study]

[Discuss what went wrong or right, and the lessons learned]

Presenter Note: Ask participants if they can relate this example to their own experiences.

Group Discussion

Discuss the following questions:

  1. What are the most common challenges you face when using a cricket lift?
  2. How can we improve communication during lifting operations?
  3. What additional safety measures can we implement to prevent accidents?

Presenter Note: Encourage active participation and facilitate the discussion.

Emergency Procedures

  1. Stop Work: Immediately stop the lifting operation if any unsafe conditions are observed.
  2. Evacuate: If a load is unstable or there is a risk of collapse, evacuate the area immediately.
  3. First Aid: Provide first aid to any injured personnel and call for medical assistance if needed.
  4. Incident Reporting: Report all incidents, near misses, and hazards to your supervisor immediately.

Questions and Answers

[Encourage participants to ask questions]

[Provide answers to common questions related to the topic]

  • Q: What do I do if I see a crack in the rigging? A: Immediately remove the rigging from service and report it to your supervisor.
  • Q: How often should the cricket lift be inspected? A: The cricket lift should be inspected before each use.
  • Q: What is the maximum load capacity of the cricket lift? A: The maximum load capacity is clearly marked on the equipment and should never be exceeded.

Summary

[Recap the main points covered in the toolbox talk]

  • Always plan the lift and inspect equipment before starting.
  • Secure the load properly and maintain clear communication.
  • Move the load slowly and deliberately.
  • Wear appropriate PPE at all times.

Action Items

[List specific actions participants should take following this toolbox talk]

  1. Review the lift plan before each operation.
  2. Conduct thorough pre-use inspections of all equipment.
  3. Report any hazards or concerns to your supervisor.

Remember: Safety is everyone's responsibility. Take the time to do the job right.

Report all hazards, near-misses, and incidents to your supervisor immediately.

Safety powered by SALUS


Important Safety Note:

Always verify safety information with your organization's specific guidelines and local regulations.

References

Page links are approximate
[1]↑

GAF - Shingle Line Paint SDS - 4073

Open Document

Page 4

[2]↑

LIQUID NAILS Heavy Duty Interior & Exterior Construction Adhesive - Solvent Based

Open Document

Page 8

  • Terms of Service
  • Privacy Policy
  • Safety powered by SALUS