Create pre task plan for framing metal stud walls
Generated on: April 16, 2025

Pre-Task Plan: Framing Metal Stud Walls

Date: [DATE] Work Area: [WORK AREA] Task Supervisor: [SUPERVISOR NAME]

1. Task Description

Framing metal stud walls involves measuring, cutting, and assembling metal studs to create the framework for walls in a building. This task includes securing the studs to the floor and ceiling tracks and ensuring the structure is plumb and level.

2. Task Duration

Estimated Start: [START TIME] Estimated Completion: [END TIME]

3. Personnel Involved

  • Carpenter
  • Laborer
  • Supervisor

4. Task-Specific Hazards and Controls

HazardRiskControl Measures
Sharp edges on metal studsCuts and lacerationsWear cut-resistant gloves and long sleeves [1].
Heavy lifting of metal studsStrains and sprainsUse proper lifting techniques and team lifting for heavy or awkward loads [1].
Working at heightsFallsUse appropriate fall protection systems such as guardrails or personal fall arrest systems [2].

5. Required PPE for Today's Task

  • Hard hat
  • Safety glasses
  • Cut-resistant gloves
  • Steel-toed boots

6. Tools and Equipment Needed

  • Tape measure
  • Metal snips
  • Screw gun
  • Level
  • Chalk line

7. Pre-Start Checklist

Area Preparation

  • Ensure work area is clear of debris and tripping hazards.
  • Verify that all necessary materials are on site.
  • Confirm that lighting is adequate for the task.

Equipment Checks

  • Inspect tools for damage or wear.
  • Ensure all power tools are grounded and in good working condition.
  • Check that ladders and scaffolding are stable and secure.

Communication

  • Conduct a pre-task briefing with all personnel.
  • Establish hand signals or radio communication for team coordination.

8. Task Steps Overview

  1. Measure and mark the layout for the wall on the floor and ceiling.
  2. Cut metal studs and tracks to the required lengths.
  3. Secure the bottom track to the floor and the top track to the ceiling.
  4. Insert and secure metal studs into the tracks at specified intervals.
  5. Check the alignment and plumb of the wall frame.

9. Emergency Response for This Task

  • Severe cut or injury → Administer first aid and call emergency services if necessary.
  • Fall from height → Do not move the injured person, call emergency services immediately.

10. Task-Specific Precautions

  • Ensure all personnel are trained in the use of fall protection equipment.
  • Keep hands clear of cutting edges and pinch points.
  • Maintain a clean and organized work area to prevent trips and falls.

Pre-Task Briefing Confirmation

All workers understand the task, associated hazards, and required controls.

Team Lead Initials: [___] Date: [DATE] Time: [TIME]

Safety powered by SALUS


Important Safety Note:

Always verify safety information with your organization's specific guidelines and local regulations.

References

Page links are approximate
[1]↑

HIOSH Construction Standards: Occupational Safety and Health (12-8-3)

Open Document

Page 14

[2]↑

General Regulation (N.B. Reg. 91-191)

Open Document

Page 108