Pre-Task Plan: Excavation
Date: [DATE] Work Area: [WORK AREA] Task Supervisor: [SUPERVISOR NAME]
1. Task Description
Excavation of a trench for utility installation, including soil removal and shoring installation.
2. Task Duration
Estimated Start: [START TIME] Estimated Completion: [END TIME]
3. Personnel Involved
- Excavator Operator
- Laborer
- Safety Officer
4. Task-Specific Hazards and Controls
Hazard | Risk | Control Measures |
---|---|---|
Cave-ins | Burial or injury | Use protective systems such as shoring or trench boxes [1]. Ensure a competent person inspects the excavation daily [2]. |
Hazardous Atmospheres | Asphyxiation or poisoning | Test for hazardous gases and ensure adequate ventilation [3]. Use respiratory protection if necessary [3]. |
Water Accumulation | Drowning or slips | Keep excavation free of water using pumps and monitor by a competent person [3]. |
5. Required PPE for Today's Task
- Hard hat
- High-visibility vest
- Steel-toed boots
- Respiratory protection (if required)
6. Tools and Equipment Needed
- Excavator
- Shoring equipment
- Gas detector
7. Pre-Start Checklist
Area Preparation
- Verify location of underground utilities [4].
- Ensure spoil piles are at least 1.2 meters from the edge [5].
- Set up barriers and warning signs around the excavation site [6].
Equipment Checks
- Inspect excavator for operational safety.
- Check shoring equipment for integrity.
- Calibrate gas detector.
Communication
- Conduct a safety briefing with all personnel.
- Establish hand signals for communication with equipment operators.
8. Task Steps Overview
- Conduct a site inspection and mark utility lines.
- Set up barriers and warning signs.
- Excavate trench to required depth.
- Install shoring or trench box.
- Monitor for hazardous atmospheres and water accumulation.
9. Emergency Response for This Task
- Cave-in → Evacuate area and call emergency services.
- Hazardous gas detection → Evacuate area and ventilate.
10. Task-Specific Precautions
- Ensure all personnel are trained in emergency procedures.
- Maintain clear access and egress from the trench [7].
- Avoid working under suspended loads [6].
Pre-Task Briefing Confirmation
All workers understand the task, associated hazards, and required controls.
Team Lead Initials: [___] Date: [DATE] Time: [TIME]
Safety powered by SALUS
Important Safety Note:
Always verify safety information with your organization's specific guidelines and local regulations.
References
Page links are approximate[2]↑
Rules for the Administration of the Oregon Safe Employment Act (Construction, Division 3, OSHA Oregon)
Open DocumentPage 705
[3]↑
Rules for the Administration of the Oregon Safe Employment Act (Construction, Division 3, OSHA Oregon)
Open DocumentPage 703
[6]↑
Rules for the Administration of the Oregon Safe Employment Act (Construction, Division 3, OSHA Oregon)
Open DocumentPage 702