Pre-Task Plan: Excavation

Date: [DATE] Work Area: [WORK AREA] Task Supervisor: [SUPERVISOR NAME]

1. Task Description

Excavation of a trench for utility installation, including soil removal and shoring installation.

2. Task Duration

Estimated Start: [START TIME] Estimated Completion: [END TIME]

3. Personnel Involved

  • Excavator Operator
  • Laborer
  • Safety Officer

4. Task-Specific Hazards and Controls

HazardRiskControl Measures
Cave-insBurial or injuryUse protective systems such as shoring or trench boxes [1]. Ensure a competent person inspects the excavation daily [2].
Hazardous AtmospheresAsphyxiation or poisoningTest for hazardous gases and ensure adequate ventilation [3]. Use respiratory protection if necessary [3].
Water AccumulationDrowning or slipsKeep excavation free of water using pumps and monitor by a competent person [3].

5. Required PPE for Today's Task

  • Hard hat
  • High-visibility vest
  • Steel-toed boots
  • Respiratory protection (if required)

6. Tools and Equipment Needed

  • Excavator
  • Shoring equipment
  • Gas detector

7. Pre-Start Checklist

Area Preparation

  • Verify location of underground utilities [4].
  • Ensure spoil piles are at least 1.2 meters from the edge [5].
  • Set up barriers and warning signs around the excavation site [6].

Equipment Checks

  • Inspect excavator for operational safety.
  • Check shoring equipment for integrity.
  • Calibrate gas detector.

Communication

  • Conduct a safety briefing with all personnel.
  • Establish hand signals for communication with equipment operators.

8. Task Steps Overview

  1. Conduct a site inspection and mark utility lines.
  2. Set up barriers and warning signs.
  3. Excavate trench to required depth.
  4. Install shoring or trench box.
  5. Monitor for hazardous atmospheres and water accumulation.

9. Emergency Response for This Task

  • Cave-in → Evacuate area and call emergency services.
  • Hazardous gas detection → Evacuate area and ventilate.

10. Task-Specific Precautions

  • Ensure all personnel are trained in emergency procedures.
  • Maintain clear access and egress from the trench [7].
  • Avoid working under suspended loads [6].

Pre-Task Briefing Confirmation

All workers understand the task, associated hazards, and required controls.

Team Lead Initials: [___] Date: [DATE] Time: [TIME]

Safety powered by SALUS


Important Safety Note:

Always verify safety information with your organization's specific guidelines and local regulations.

References

Page links are approximate
[1]↑

Safety and Health Regulations for Construction (OSHA)

Open Document

Page 95

[2]↑

Rules for the Administration of the Oregon Safe Employment Act (Construction, Division 3, OSHA Oregon)

Open Document

Page 705

[3]↑

Rules for the Administration of the Oregon Safe Employment Act (Construction, Division 3, OSHA Oregon)

Open Document

Page 703

[4]↑

Safety and Health Regulations for Construction (OSHA)

Open Document

Page 93

[5]↑

General Regulation (N.B. Reg. 91-191)

Open Document

Page 169

[6]↑

Rules for the Administration of the Oregon Safe Employment Act (Construction, Division 3, OSHA Oregon)

Open Document

Page 702

[7]↑

Safety and Health Regulations for Construction (OSHA)

Open Document

Page 94

  • Terms of Service
  • Privacy Policy
  • Safety powered by SALUS