Pre-Task Plan: Concrete Pouring

Date: [DATE] Work Area: [WORK AREA] Task Supervisor: [SUPERVISOR NAME]

1. Task Description

[Pouring concrete for the designated structure/area as per project specifications]

2. Task Duration

Estimated Start: [START TIME] Estimated Completion: [END TIME]

3. Personnel Involved

  • [Concrete finishers]
  • [Pump operator]
  • [Laborers]

4. Task-Specific Hazards and Controls

HazardRiskControl Measures
Formwork failureCollapse, injury to workers [1], [2], [3]Ensure formwork and shoring are inspected by a competent person and authorized in writing before pouring [1]. Erect, support, and brace formwork to withstand all loads [1], [3]. Follow engineer's design and specifications for bracing and shoring [2], [3].
Reinforcing steelImpalement if unguarded [4]Guard protruding reinforcing steel to eliminate impalement hazards [4].
Concrete pump truck operationInstability, boom collapse, worker injury [5]Extend outriggers per manufacturer's specifications [5]. Ensure no one is positioned under the distribution boom [5]. Inspect load-bearing components and safety devices before use [5].
Slips, trips, and fallsInjuries from falls on slippery or uneven surfacesMaintain good housekeeping. Wear appropriate footwear. Clear pathways and work areas of obstructions.
Contact with live electrical circuitsElectrocution [6]Use non-conductive tools around electrical sources [7]. Avoid contact with any live electrical circuit or equipment [6].
Unguarded edgesFalls from heightInstall safety nets or use fall-arresting systems where applicable [8].

5. Required PPE for Today's Task

  • [Hard hat]
  • [Safety glasses]
  • [Gloves]
  • [Steel-toe boots]
  • [High visibility safety apparel] [9]

6. Tools and Equipment Needed

  • [Concrete pump truck]
  • [Concrete buckets]
  • [Bull floats]
  • [Vibrator]
  • [Shovels/rakes]

7. Pre-Start Checklist

Area Preparation

  • Ensure the work area is clear of obstructions.
  • Establish a safe traffic flow pattern.
  • Barricade the work area to prevent unauthorized access [6].

Equipment Checks

  • Inspect concrete pump and placing booms per CSA Z151-09 [10].
  • Verify that concrete buckets have safety latches [7].
  • Check bull float handles for non-conductive material [7].

Communication

  • Review hand signals for communication with the pump operator.
  • Confirm emergency shutdown procedures.
  • Ensure all workers are aware of the pouring sequence.

8. Task Steps Overview

  1. Set up concrete pump truck and ensure proper outrigger placement [5].
  2. Inspect formwork and ensure authorization for the pour [1].
  3. Begin concrete pour, monitoring formwork for stability [1], [3].
  4. Use vibrator to consolidate concrete.
  5. Finish concrete surface with bull floats.

9. Emergency Response for This Task

  • Formwork collapse → Evacuate the area, account for all personnel, and contact emergency services.
  • Equipment malfunction → Stop work, secure the area, and notify the supervisor.

10. Task-Specific Precautions

  • Avoid working under elevated concrete buckets [11].
  • Do not exceed the safe rate of lift [12].
  • Guard protruding rebar to prevent impalement [4].

Pre-Task Briefing Confirmation

All workers understand the task, associated hazards, and required controls.

Team Lead Initials: [___] Date: [DATE] Time: [TIME]

Safety powered by SALUS


Important Safety Note:

Always verify safety information with your organization's specific guidelines and local regulations.

References

Page links are approximate
[1]↑

General Regulation (N.B. Reg. 91-191)

Open Document

Page 106

[2]↑

Occupational Safety General Regulations (N.S. Reg. 44/99)

Open Document

Page 86

[3]↑

General Regulation (N.B. Reg. 91-191)

Open Document

Page 105

[4]↑

Rules for the Administration of the Oregon Safe Employment Act (Construction, Division 3, OSHA Oregon)

Open Document

Page 765

[5]↑

Occupational Health and Safety Code

Open Document

Page 167

[6]↑

Canada Occupational Health and Safety Regulations (SOR/86-304)

Open Document

Page 39

[7]↑

Rules for the Administration of the Oregon Safe Employment Act (Construction, Division 3, OSHA Oregon)

Open Document

Page 767

[8]↑

General Regulation (N.B. Reg. 91-191)

Open Document

Page 115

[9]↑

General Regulation (N.B. Reg. 91-191)

Open Document

Page 103

[10]↑

General Regulation (N.B. Reg. 91-191)

Open Document

Page 104

[11]↑

Rules for the Administration of the Oregon Safe Employment Act (Construction, Division 3, OSHA Oregon)

Open Document

Page 766

[12]↑

Rules for the Administration of the Oregon Safe Employment Act (Construction, Division 3, OSHA Oregon)

Open Document

Page 770

AI Safety Tools

  • Toolbox Talks
  • Pre-Task Plans
  • Risk Assessments
  • Safe Work Procedures
  • Safety Checklists

Company

  • About
  • Contact
  • Terms of Service
  • Privacy Policy

© 2026 SALUS Safety. All rights reserved.

< for the nerds />
Assistant
History
DocumentsLabs