Pre-Task Plan: Excavation for Pipe

Date: [DATE] Work Area: [WORK AREA] Task Supervisor: [SUPERVISOR NAME]

1. Task Description

Excavation of a trench for the installation of a new pipe [1], including locating underground utilities [2], excavating the trench to the required depth, installing the pipe, and backfilling the trench.

2. Task Duration

Estimated Start: [START TIME] Estimated Completion: [END TIME]

3. Personnel Involved

  • Excavator Operator
  • Pipe Layer
  • Competent Person

4. Task-Specific Hazards and Controls

HazardRiskControl Measures
Cave-ins/Sliding Material [1]Entrapment, burial, or injury to workers [1]Ensure a protective system is in place for trenches more than 1.2 meters deep, such as sloping, shoring, or trench boxes [3]. A competent person must inspect the excavation daily for potential cave-in hazards [4].
Underground Utilities (pipelines, cables, conduits) [2]Electrocution, explosion, or exposure to hazardous materials [5]Before excavating, accurately establish the location of all underground pipelines, cables, and conduits and ensure they are conspicuously marked [2]. Contact utility companies to locate underground installations prior to excavation [6]. If disturbing soil within 600mm of a utility, expose the utility by hand digging or other approved method before mechanical excavating begins [2].
Falling Loads/EquipmentInjury to workersKeep materials and equipment at least 2 feet (.61 m) from the edge of excavations, or use retaining devices [4].
Hazardous Atmospheres [5]Exposure to explosive, flammable, poisonous, corrosive, oxidizing, irritating, oxygen deficient, or toxic atmospheres [5]Test the atmosphere in the excavation for oxygen deficiency, flammable gases, and toxic substances, especially in confined spaces or areas with potential for gas leaks [7]. Provide ventilation if necessary [7].
Water AccumulationDrowning, cave-inDo not work in excavations with accumulated water unless adequate precautions have been taken [7]. Use water removal equipment and monitor its operation [7].
Instability of Adjacent StructuresCollapse of structuresIf the stability of a structure may be affected by the excavation, support the structure with a temporary protective structure designed by a professional engineer [2].

5. Required PPE for Today's Task

  • Hard hat
  • Safety glasses
  • Steel-toe boots
  • High-visibility vest
  • Gloves

6. Tools and Equipment Needed

  • Excavator
  • Shoring or trench box (if required)
  • Shovels
  • Hand tools
  • Pipe laying equipment
  • Gas detector
  • Ladder

7. Pre-Start Checklist

Area Preparation

  • Ensure underground utilities have been located and marked [2].
  • Establish a clear and safe work zone, including barricades and signage.
  • Check for overhead obstructions (power lines, trees).

Equipment Checks

  • Inspect the excavator for proper functioning and safety features.
  • Inspect shoring or trench box for damage and ensure it meets requirements [3].
  • Ensure gas detector is calibrated and functioning properly.

Communication

  • Conduct a pre-task briefing with all workers involved.
  • Establish hand signals or other communication methods for equipment operation.
  • Review emergency procedures and contact information.

8. Task Steps Overview

  1. Locate and mark underground utilities [2].
  2. Excavate trench to required depth and width [1].
  3. Install shoring or trench box if required [3].
  4. Lay pipe and make connections.
  5. Backfill trench and compact soil.

9. Emergency Response for This Task

  • Cave-in → Immediately evacuate the area and contact emergency services.
  • Gas leak → Evacuate the area, shut off equipment, and notify the gas company.
  • Injury → Provide first aid and contact emergency services if needed.

10. Task-Specific Precautions

  • No worker shall enter an unprotected trench that is 1.2 meters or more in depth [3].
  • A competent person must inspect the excavation daily [4].
  • Keep equipment and spoil piles at least 1 meter from the edge of the excavation [2].

Pre-Task Briefing Confirmation

All workers understand the task, associated hazards, and required controls.

Team Lead Initials: [___] Date: [DATE] Time: [TIME]

Safety powered by SALUS


Important Safety Note:

Always verify safety information with your organization's specific guidelines and local regulations.

References

Page links are approximate
[1]↑

Safety and Health Regulations for Construction (OSHA)

Open Document

Page 91

[2]↑

Occupational Health and Safety Regulations, 2020 (Sask. Reg. 10/2020)

Open Document

Page 143

[3]↑

Occupational Health and Safety Regulations, 2020 (Sask. Reg. 10/2020)

Open Document

Page 146

[4]↑

Safety and Health Regulations for Construction (OSHA)

Open Document

Page 96

[5]↑

Safety and Health Regulations for Construction (OSHA)

Open Document

Page 92

[6]↑

Safety and Health Regulations for Construction (OSHA)

Open Document

Page 93

[7]↑

Safety and Health Regulations for Construction (OSHA)

Open Document

Page 95

  • Terms of Service
  • Privacy Policy
  • Safety powered by SALUS