Safety Assistant
Powered by SALUSIQ
RESEARCH
Create a pre-task plan for electrical maintenance
Generated on: April 13, 2025

Pre-Task Plan: Electrical Maintenance

Date: [DATE] Work Area: [WORK AREA] Task Supervisor: [SUPERVISOR NAME]

1. Task Description

Perform maintenance on electrical systems, including inspection, testing, and repair of electrical equipment and wiring.

2. Task Duration

Estimated Start: [START TIME] Estimated Completion: [END TIME]

3. Personnel Involved

  • Electrician
  • Electrical Technician
  • Safety Officer

4. Task-Specific Hazards and Controls

HazardRiskControl Measures
Contact with energized partsElectric shock or electrocutionDe-energize and lock out equipment before maintenance. Use insulated tools and wear rubber gloves [1].
Working near overhead linesElectric shock or electrocutionEnsure lines are de-energized and grounded, or use protective measures such as guarding or insulating [2].
Confined spaces (e.g., manholes)Limited escape routes, potential for electric shockUse protective shields, barriers, or insulating materials to avoid contact with energized parts [3].

5. Required PPE for Today's Task

  • Insulated gloves
  • Safety goggles
  • Hard hat

6. Tools and Equipment Needed

  • Insulated tools
  • Multimeter
  • Lockout/tagout devices

7. Pre-Start Checklist

Area Preparation

  • Ensure work area is clear of unnecessary personnel
  • Verify that all equipment is de-energized and locked out
  • Confirm that warning signs are in place

Equipment Checks

  • Inspect tools for insulation integrity
  • Test multimeter for proper operation
  • Verify lockout/tagout devices are functional

Communication

  • Brief team on task-specific hazards and controls
  • Establish emergency communication protocol

8. Task Steps Overview

  1. Conduct a visual inspection of the electrical system.
  2. De-energize and lock out the electrical equipment.
  3. Perform necessary maintenance and repairs.
  4. Test the system to ensure proper operation.
  5. Re-energize the system and remove lockout/tagout devices.

9. Emergency Response for This Task

  • Electric shock → Call emergency services and administer first aid (CPR if necessary)
  • Fire → Use a Class C fire extinguisher and evacuate the area

10. Task-Specific Precautions

  • Ensure all personnel are trained in electrical safety
  • Maintain a safe distance from energized parts
  • Use only approved and tested equipment

Pre-Task Briefing Confirmation

All workers understand the task, associated hazards, and required controls.

Team Lead Initials: [___] Date: [DATE] Time: [TIME]

Safety powered by SALUS


Important Safety Note:

Always verify safety information with your organization's specific guidelines and local regulations.

References

Page links are approximate
[1]↑

General Regulation (N.B. Reg. 91-191)

Open Document

Page 253

[2]↑

Safety Standards for General Safety and Health Standards (Chaper 296-24 WAC)

Open Document

Page 482

[3]↑

Safety Standards for General Safety and Health Standards (Chaper 296-24 WAC)

Open Document

Page 483

  • < for the nerds />
  • Terms of Service
  • Privacy Policy
  • Safety powered by SALUS
Assistant
History
DocumentsLabs