Construction Site Setup Safety Checklist
Date: 2025-08-25
Inspector: [INSPECTOR NAME]
Location/Area: [LOCATION/AREA]
Department: [DEPARTMENT]
Purpose
This checklist is to be used before beginning any construction project to ensure the site is safely set up and compliant with regulations. It covers key areas such as access, utilities, equipment, and emergency preparedness.
Instructions for Use
- 1. Walk the entire site and observe each area.
- 2. Use this checklist to verify each item.
- 3. Note any deficiencies and required corrective actions.
- 4. Implement corrective actions immediately for critical issues.
- 5. Document all findings and actions taken.
Frequency
This checklist should be completed: Daily
Safety Checklist
I. Site Access and Movement
Ensuring safe entry and movement within the construction site.
| Item | Pass | Fail | Comments |
|---|---|---|---|
| Adequate work areas provided Check: Sufficient space for workers to perform tasks safely without overcrowding. If failed: Reorganize layout to provide more space; reduce number of workers in the area at one time. | _________________ | ||
| Adequate walkways and runways Check: Clear and unobstructed pathways for workers to move around the site. If failed: Clear obstructions; install walkways where necessary. | _________________ | ||
| Adequate ladders, stairways, or elevators Check: Safe and accessible means of reaching different levels of the site. If failed: Provide additional ladders or stairways; repair or replace damaged ones. | _________________ |
II. Utilities and Services
Checking the safe location and setup of utilities.
| Item | Pass | Fail | Comments |
|---|---|---|---|
| Location of utilities Check: Utilities (saw, tool sheds, office, etc.) are in a safe, convenient place. If failed: Relocate utilities to a safer area. | _________________ | ||
| High-voltage lines Check: High-voltage lines are identified, and measures are in place to prevent contact (moved, de-energized, or barrier erected). If failed: Arrange to move or de-energize lines; erect barriers. | _________________ | ||
| Sanitary facilities, drinking water, power Check: Located for safety and convenience. If failed: Relocate to a more suitable location. | _________________ |
III. Tools and Equipment
Ensuring tools and equipment are in good condition and properly supplied.
| Item | Pass | Fail | Comments |
|---|---|---|---|
| Repair, maintenance, and care Check: Tools and equipment are regularly maintained and in good working order. If failed: Repair or replace faulty equipment; implement a maintenance schedule. | _________________ | ||
| Inspection Check: Regular inspection of tools and equipment before use. If failed: Implement a daily inspection routine. | _________________ | ||
| Adequate supplies Check: Sufficient tools for each part of the job. If failed: Provide additional tools as needed. | _________________ |
IV. Work Procedures
Checking materials handling and storage procedures.
| Item | Pass | Fail | Comments |
|---|---|---|---|
| Methods of elevating and handling materials Check: Safe methods in place for lifting and moving materials. If failed: Provide training on safe lifting techniques; use appropriate equipment. | _________________ | ||
| Adequate space Check: Sufficient space for materials handling. If failed: Clear additional space; reorganize storage. | _________________ | ||
| Proper auxiliary equipment Check: Cranes, hoists, elevators, trucks, etc., are appropriate and in good condition. If failed: Repair or replace faulty equipment; ensure operators are trained. | _________________ |
V. Emergency Preparedness
Ensuring the site is prepared for emergencies.
| Item | Pass | Fail | Comments |
|---|---|---|---|
| Evacuation procedures Check: Clearly defined evacuation routes and procedures are posted. If failed: Create and post evacuation plans; conduct drills. | _________________ | ||
| Shutdown procedures Check: Procedures for shutting down equipment in an emergency are established. If failed: Develop and document shutdown procedures; train workers. | _________________ | ||
| Emergency numbers Check: Emergency contact numbers are posted. If failed: Post emergency numbers near phones and in prominent locations. | _________________ | ||
| First aid materials Check: Adequate first aid materials are available on site. If failed: Restock first aid kits; ensure they are easily accessible. | _________________ |
General Requirements
| Item | Pass | Fail | Comments |
|---|---|---|---|
| Housekeeping Check: Work areas and passageways are clear of rubbish, debris, nails, etc. If failed: Implement a regular cleaning schedule. | _________________ | ||
| Floor and roof openings Check: Protection in place for floor and roof openings. If failed: Install guardrails or covers. | _________________ | ||
| Illumination Check: Adequate lighting provided in all work areas. If failed: Add additional lighting as needed. | _________________ | ||
| Safety posters and warning signs Check: Safety posters and warning signs are displayed. If failed: Install or replace missing/damaged signs. | _________________ |
Failed Item Procedures
- If any item fails inspection, immediately take corrective action. If the issue poses an immediate danger, stop work until it is resolved.
Documentation Requirements
Maintain records of all inspections, corrective actions, and safety training.
Checklist Completion
Overall Status: ☐ Pass ☐ Fail ☐ Corrective Actions Required
Inspector Signature: Date:
Supervisor Review: Date:
Corrective Actions Completed By: Date:
References and Standards
- Occupational Health and Safety Act for your jurisdiction [1]
- National Fire Code [1]
- National Electrical Code [1]
- Environmental Protection Act [1]
This checklist must be retained for [RETENTION PERIOD].
Safety powered by SALUS
Important Safety Note:
Always verify safety information with your organization's specific guidelines and local regulations.