Create a pre-task plan for electrical maintenance
Generated on: July 1, 2025
Pre-Task Plan: Electrical Maintenance
Date: [DATE] Work Area: [WORK AREA] Task Supervisor: [SUPERVISOR NAME]
1. Task Description
[Specific electrical maintenance tasks to be performed, e.g., replacing a faulty circuit breaker, inspecting wiring, etc.]
2. Task Duration
Estimated Start: [START TIME] Estimated Completion: [END TIME]
3. Personnel Involved
- [Electrician]
- [Assistant]
4. Task-Specific Hazards and Controls
| Hazard | Risk | Control Measures |
|---|---|---|
| Electrical shock | Electrocution, burns | De-energize and lockout/tagout the circuit before starting work. Verify zero energy with a meter. Use insulated tools and wear appropriate PPE. |
| Arc flash | Burns, eye damage | Wear appropriate arc-rated PPE (clothing, face shield, gloves). Maintain safe distance from energized equipment. |
| Exposure to dust | Respiratory irritation [1], eye irritation [1] | Ensure good ventilation/suction at the workplace [2]. Wear respiratory protection if ventilation is inadequate [2]. Wear protective glasses [2]. |
5. Required PPE for Today's Task
- [Safety glasses]
- [Insulated gloves]
- [Arc-rated clothing (if applicable)]
- [Hard hat]
6. Tools and Equipment Needed
- [Multimeter]
- [Insulated screwdrivers and pliers]
- [Wire strippers]
- [Voltage tester]
- [Lockout/tagout equipment]
7. Pre-Start Checklist
Area Preparation
- [Ensure the work area is clear of obstructions]
- [Provide adequate lighting]
- [Set up warning signs and barriers]
Equipment Checks
- [Inspect tools for damage (e.g., frayed cords, cracked insulation)]
- [Verify the multimeter is functioning correctly]
- [Ensure lockout/tagout equipment is in good condition]
Communication
- [Brief all personnel on the task, hazards, and controls]
- [Establish clear communication signals]
8. Task Steps Overview
- [De-energize and lockout/tagout the circuit]
- [Verify zero energy]
- [Perform the electrical maintenance task]
- [Inspect the work]
- [Remove lockout/tagout and re-energize the circuit]
9. Emergency Response for This Task
- [Electric shock] → [Immediately de-energize the circuit (if safe). Call for medical assistance.]
- [Arc flash] → [Call for medical assistance. Treat burns.]
10. Task-Specific Precautions
- [Never work on energized circuits unless absolutely necessary and with proper precautions]
- [Use the buddy system]
- [Keep work area dry]
Pre-Task Briefing Confirmation
All workers understand the task, associated hazards, and required controls.
Team Lead Initials: [___] Date: [DATE] Time: [TIME]
Safety powered by SALUS
Important Safety Note:
Always verify safety information with your organization's specific guidelines and local regulations.