Safety Assistant
Powered by SALUSIQ
RESEARCH

Create a pre-task plan for electrical maintenance

Generated on: July 1, 2025

Pre-Task Plan: Electrical Maintenance

Date: [DATE] Work Area: [WORK AREA] Task Supervisor: [SUPERVISOR NAME]

1. Task Description

[Specific electrical maintenance tasks to be performed, e.g., replacing a faulty circuit breaker, inspecting wiring, etc.]

2. Task Duration

Estimated Start: [START TIME] Estimated Completion: [END TIME]

3. Personnel Involved

  • [Electrician]
  • [Assistant]

4. Task-Specific Hazards and Controls

HazardRiskControl Measures
Electrical shockElectrocution, burnsDe-energize and lockout/tagout the circuit before starting work. Verify zero energy with a meter. Use insulated tools and wear appropriate PPE.
Arc flashBurns, eye damageWear appropriate arc-rated PPE (clothing, face shield, gloves). Maintain safe distance from energized equipment.
Exposure to dustRespiratory irritation [1], eye irritation [1]Ensure good ventilation/suction at the workplace [2]. Wear respiratory protection if ventilation is inadequate [2]. Wear protective glasses [2].

5. Required PPE for Today's Task

  • [Safety glasses]
  • [Insulated gloves]
  • [Arc-rated clothing (if applicable)]
  • [Hard hat]

6. Tools and Equipment Needed

  • [Multimeter]
  • [Insulated screwdrivers and pliers]
  • [Wire strippers]
  • [Voltage tester]
  • [Lockout/tagout equipment]

7. Pre-Start Checklist

Area Preparation

  • [Ensure the work area is clear of obstructions]
  • [Provide adequate lighting]
  • [Set up warning signs and barriers]

Equipment Checks

  • [Inspect tools for damage (e.g., frayed cords, cracked insulation)]
  • [Verify the multimeter is functioning correctly]
  • [Ensure lockout/tagout equipment is in good condition]

Communication

  • [Brief all personnel on the task, hazards, and controls]
  • [Establish clear communication signals]

8. Task Steps Overview

  1. [De-energize and lockout/tagout the circuit]
  2. [Verify zero energy]
  3. [Perform the electrical maintenance task]
  4. [Inspect the work]
  5. [Remove lockout/tagout and re-energize the circuit]

9. Emergency Response for This Task

  • [Electric shock] → [Immediately de-energize the circuit (if safe). Call for medical assistance.]
  • [Arc flash] → [Call for medical assistance. Treat burns.]

10. Task-Specific Precautions

  • [Never work on energized circuits unless absolutely necessary and with proper precautions]
  • [Use the buddy system]
  • [Keep work area dry]

Pre-Task Briefing Confirmation

All workers understand the task, associated hazards, and required controls.

Team Lead Initials: [___] Date: [DATE] Time: [TIME]

Safety powered by SALUS


Important Safety Note:

Always verify safety information with your organization's specific guidelines and local regulations.

References

Page links are approximate
[1]↑

Loctite Epoxy Marine - Hardener

Open Document

Page 6

[2]↑

Loctite Power Grab Ultimate

Open Document

Page 3

AI Safety Tools

  • Toolbox Talks
  • Pre-Task Plans
  • Risk Assessments
  • Safe Work Procedures
  • Safety Checklists

Company

  • About
  • Contact
  • Terms of Service
  • Privacy Policy

© 2026 SALUS Safety. All rights reserved.

< for the nerds />
Assistant
History
DocumentsLabs