Hanging drywall
Generated on: April 16, 2025

Pre-Task Plan: Hanging Drywall

Date: [DATE] Work Area: [WORK AREA] Task Supervisor: [SUPERVISOR NAME]

1. Task Description

Hanging drywall involves lifting, positioning, and securing drywall panels to the framing of walls and ceilings.

2. Task Duration

Estimated Start: [START TIME] Estimated Completion: [END TIME]

3. Personnel Involved

  • Drywall Installer
  • Helper
  • Safety Officer

4. Task-Specific Hazards and Controls

HazardRiskControl Measures
Lifting heavy drywall panelsMusculoskeletal injuriesUse proper lifting techniques and team lifting for heavy panels [1].
Working at heightsFallsUse scaffolding with guardrails and personal fall arrest systems [1] [2].
Dust from cutting drywallRespiratory issuesUse dust masks or respirators and ensure proper ventilation [1].

5. Required PPE for Today's Task

  • Hard hats
  • Safety glasses
  • Dust masks or respirators
  • Gloves
  • Safety harnesses (if working at heights)

6. Tools and Equipment Needed

  • Drywall lift
  • Scaffolding
  • Screw gun
  • Utility knife
  • T-square

7. Pre-Start Checklist

Area Preparation

  • Ensure work area is clear of debris and tripping hazards.
  • Verify scaffolding is properly assembled and stable [1].
  • Confirm adequate lighting is available.

Equipment Checks

  • Inspect scaffolding for damage or wear [1].
  • Check all tools for proper operation.
  • Ensure all PPE is available and in good condition.

Communication

  • Conduct a safety briefing with all personnel.
  • Establish hand signals for communication when lifting panels.

8. Task Steps Overview

  1. Set up scaffolding and ensure it is secure.
  2. Lift drywall panels using a drywall lift or team lifting.
  3. Position panels on the wall or ceiling.
  4. Secure panels with screws using a screw gun.
  5. Cut panels to fit as necessary using a utility knife.

9. Emergency Response for This Task

  • Fall from height → Call emergency services and provide first aid.
  • Injury from lifting → Administer first aid and seek medical attention if necessary.

10. Task-Specific Precautions

  • Ensure all personnel are trained in proper lifting techniques.
  • Do not work on scaffolding during high winds or storms [1].
  • Keep the work area clean to prevent slips and trips.

Pre-Task Briefing Confirmation

All workers understand the task, associated hazards, and required controls.

Team Lead Initials: [___] Date: [DATE] Time: [TIME]

Safety powered by SALUS


Important Safety Note:

Always verify safety information with your organization's specific guidelines and local regulations.

References

Page links are approximate
[1]↑

Spider by Brand Safway: Swing Stage Operator’s Manual

Open Document

Page 4

[2]↑

Safety and Health Regulations for Construction (OSHA)

Open Document

Page 86

  • Terms of Service
  • Privacy Policy
  • Safety powered by SALUS