Pre-Task Plan: Scaffold Inspection
Date: [DATE] Work Area: [WORK AREA] Task Supervisor: [SUPERVISOR NAME]
1. Task Description
Inspect scaffold components for damage, proper assembly, and stability prior to use. Ensure compliance with safety regulations.
2. Task Duration
Estimated Start: [START TIME] Estimated Completion: [END TIME]
3. Personnel Involved
4. Task-Specific Hazards and Controls
Hazard | Risk | Control Measures |
---|---|---|
Fall from height | Serious injury or death | Ensure proper guardrails, mid-rails, and toe boards are in place. Use personal fall arrest system (PFAS) with 100% tie-off where required. |
Scaffold collapse | Injury to personnel | Verify scaffold is erected on a stable and level surface. Check load capacity and avoid overloading. Inspect all connections and locking devices. |
Dust inhalation | Respiratory irritation, silicosis, lung cancer | Use work methods which minimize dust production 11, 13, 19. Wear a NIOSH/MSHA approved air purifying respirator as needed to control exposure 1, 2, 6. |
Skin irritation | Dermatitis, allergic reactions | Wear protective gloves to prevent any irritation to hands from the cement or glass fiber 11, 13, 19. Wear long-sleeved shirts and pants 1, 2. |
Eye injury | Serious eye damage | Wear approved safety goggles 1, 2, 6. |
5. Required PPE for Today's Task
- Hard hat
- Safety glasses/goggles 1, 2, 6
- Gloves 1, 2, 6, 11, 13, 19
- Safety boots
- Fall Protection Harness
- Approved respirator 1, 2, 6
6. Tools and Equipment Needed
- Inspection checklist
- Measuring tape
- Level
- Camera
- Personal Fall Arrest System (PFAS)
7. Pre-Start Checklist
Area Preparation
- Ensure the area around the scaffold is clear of obstructions.
- Barricade the area to prevent unauthorized access.
- Verify adequate lighting is available.
Equipment Checks
- Inspect all PPE for damage and proper fit.
- Verify the inspection checklist is complete and available.
- Check that all tools are in good working condition.
Communication
- Conduct a pre-task briefing with all personnel involved.
- Establish clear communication signals.
8. Task Steps Overview
- Visually inspect scaffold components for damage (e.g., cracks, bends, corrosion).
- Verify proper assembly and spacing of scaffold components.
- Check the stability of the scaffold base and connections.
- Ensure guardrails, mid-rails, and toe boards are securely in place.
- Document any deficiencies and report them to the supervisor.
9. Emergency Response for This Task
- Fall from height → Activate emergency response system, provide first aid, and ensure medical attention.
- Scaffold collapse → Evacuate the area, account for all personnel, and provide first aid.
10. Task-Specific Precautions
- Do not use the scaffold if any deficiencies are identified until they are corrected.
- Maintain three points of contact when climbing the scaffold.
- Be aware of changing weather conditions and adjust work practices accordingly.
Pre-Task Briefing Confirmation
All workers understand the task, associated hazards, and required controls.
Team Lead Initials: [___] Date: [DATE] Time: [TIME]
Safety powered by SALUS
Important Safety Note:
Always verify safety information with your organization's specific guidelines and local regulations.