Iron worker building a metal staircase
Generated on: May 13, 2025
Pre-Task Plan: Metal Staircase Construction
Date: [DATE] Work Area: [WORK AREA] Task Supervisor: [SUPERVISOR NAME]
1. Task Description
Erecting a metal staircase, including hoisting, placing, connecting, welding, bolting, and bracing 3, 5.
2. Task Duration
Estimated Start: [START TIME] Estimated Completion: [END TIME]
3. Personnel Involved
- Ironworker/Steel Erector
- Rigger
- Signal person (if required)
4. Task-Specific Hazards and Controls
Hazard | Risk | Control Measures |
---|---|---|
Fall from heights | Serious injury or death | Use fall protection equipment (harness, lanyard, and anchor points) at heights above 6 feet. Ensure proper training in fall protection. Inspect fall protection equipment before use. [1] |
Falling objects | Head injury, lacerations, or other injuries | Wear hard hats. Secure tools and materials to prevent them from falling. Establish a controlled access zone below the work area. [2] |
Cuts and lacerations | Minor to serious injuries | Wear appropriate gloves. Use caution when handling sharp metal edges. |
Welding hazards (burns, fumes, arc flash) | Burns, respiratory issues, eye damage | Use proper welding PPE (welding helmet, gloves, and protective clothing). Ensure adequate ventilation. Use welding screens to protect others from arc flash. |
Strains and sprains | Musculoskeletal disorders | Use proper lifting techniques. Get assistance for heavy loads. |
5. Required PPE for Today's Task
- Hard hat
- Safety glasses with side shields
- Work gloves
- Steel-toed boots
- Fall protection harness with lanyard
- Welding helmet (if welding)
6. Tools and Equipment Needed
- Crane or hoist [3]
- Welding machine and accessories
- Bolting and connecting tools
- Measuring tools (tape measure, level)
- Fall protection equipment
- Ladders (if needed) [4]
7. Pre-Start Checklist
Area Preparation
- Clear the work area of obstructions and tripping hazards [5].
- Establish a controlled access zone to prevent unauthorized entry.
- Ensure adequate lighting.
Equipment Checks
- Inspect fall protection equipment for damage.
- Verify that all tools and equipment are in good working order.
- Check the stability of the structure to which the staircase is being attached [6].
Communication
- Conduct a pre-task briefing to discuss the plan, hazards, and controls.
- Establish clear communication signals between the ironworkers and the crane operator (if applicable).
8. Task Steps Overview
- Hoist the staircase components into position [3].
- Align and connect the staircase sections.
- Weld or bolt the connections securely [4].
- Install bracing and supports as needed [4].
- Inspect the completed staircase for stability and safety.
9. Emergency Response for This Task
- Fall from height → Activate emergency response system, provide first aid, and ensure medical attention.
- Injury from falling objects → Provide first aid and seek medical attention if necessary.
10. Task-Specific Precautions
- Never work under suspended loads.
- Use tag lines to control the movement of hoisted materials [7].
- Ensure proper ventilation when welding.
Pre-Task Briefing Confirmation
All workers understand the task, associated hazards, and required controls.
Team Lead Initials: [___] Date: [DATE] Time: [TIME]
Safety powered by SALUS
Important Safety Note:
Always verify safety information with your organization's specific guidelines and local regulations.
References
Page links are approximate[1]↑
Safety Standards for General Safety and Health Standards (Chaper 296-24 WAC)
Open DocumentPage 352
[3]↑
Rules for the Administration of the Oregon Safe Employment Act (Construction, Division 3, OSHA Oregon)
Open DocumentPage 796
[4]↑
Rules for the Administration of the Oregon Safe Employment Act (Construction, Division 3, OSHA Oregon)
Open DocumentPage 797
[5]↑
Safety Standards for General Safety and Health Standards (Chaper 296-24 WAC)
Open DocumentPage 351
[6]↑
Rules for the Administration of the Oregon Safe Employment Act (Construction, Division 3, OSHA Oregon)
Open DocumentPage 809