Pre-Task Plan: Concrete Pouring

Date: [DATE] Work Area: [WORK AREA] Task Supervisor: [SUPERVISOR NAME]

1. Task Description

Pouring concrete for a structural slab, including preparation, pouring, and finishing.

2. Task Duration

Estimated Start: [START TIME] Estimated Completion: [END TIME]

3. Personnel Involved

  • Concrete Foreman
  • Laborers
  • Equipment Operators

4. Task-Specific Hazards and Controls

HazardRiskControl Measures
Formwork failureStructural collapseEnsure formwork and shoring are inspected and authorized by an engineer before pouring [1].
Falling objectsInjury from falling tools or materialsUse guardrails and ensure all tools and materials are secured [2].
Concrete burnsSkin irritation or burnsUse appropriate PPE including gloves and long sleeves [3].

5. Required PPE for Today's Task

  • Hard hats
  • Safety glasses
  • Gloves
  • Long sleeves and pants
  • Rubber boots

6. Tools and Equipment Needed

  • Concrete mixer
  • Bull float
  • Vibrator
  • Trowels

7. Pre-Start Checklist

Area Preparation

  • Ensure formwork is properly braced and supported [4].
  • Clear area of non-essential personnel [5].
  • Verify all safety barriers are in place.

Equipment Checks

  • Inspect concrete mixer and ensure it is functioning properly [3].
  • Check all PPE for damage or wear.
  • Ensure all tools are in good working condition.

Communication

  • Conduct a safety briefing with all personnel.
  • Establish hand signals for communication during pouring.

8. Task Steps Overview

  1. Inspect and prepare formwork.
  2. Mix and transport concrete to the pour site.
  3. Pour concrete into formwork.
  4. Use vibrators to remove air pockets.
  5. Finish surface with bull float and trowels.

9. Emergency Response for This Task

  • Formwork collapse → Evacuate area immediately and contact emergency services.
  • Concrete burns → Rinse affected area with water and seek medical attention.

10. Task-Specific Precautions

  • Ensure all personnel are aware of the location of emergency exits.
  • Maintain clear communication at all times.
  • Monitor weather conditions to avoid pouring in adverse conditions.

Pre-Task Briefing Confirmation

All workers understand the task, associated hazards, and required controls.

Team Lead Initials: [___] Date: [DATE] Time: [TIME]

Safety powered by SALUS


Important Safety Note:

Always verify safety information with your organization's specific guidelines and local regulations.

References

Page links are approximate
[1]↑

General Regulation (N.B. Reg. 91-191)

Open Document

Page 106

[2]↑

General Regulation (N.B. Reg. 91-191)

Open Document

Page 113

[3]↑

Rules for the Administration of the Oregon Safe Employment Act (Construction, Division 3, OSHA Oregon)

Open Document

Page 766

[4]↑

Occupational Safety General Regulations (N.S. Reg. 44/99)

Open Document

Page 86

[5]↑

General Regulation (N.B. Reg. 91-191)

Open Document

Page 108

AI Safety Tools

  • Toolbox Talks
  • Pre-Task Plans
  • Risk Assessments
  • Safe Work Procedures
  • Safety Checklists

Company

  • About
  • Contact
  • Terms of Service
  • Privacy Policy

© 2026 SALUS Safety. All rights reserved.

< for the nerds />
Assistant
History
DocumentsLabs