[PRE TASK PLAN TITLE]
Project: [PROJECT NAME]
Date: 2026-01-09
Location: [LOCATION]
Supervisor: [SUPERVISOR NAME]
Task Overview
Conduct daily safety briefings focusing on equipment inspection procedures and hazard identification to ensure regulatory compliance.
Expected Duration: 15-20 minutes
Number of Workers: All site personnel
Required PPE and Equipment
Personal Protective Equipment
- Hard Hat: ANSI Z89.1 Type I or Type II compliant hard hat. Inspect for cracks, dents, or damage before each use. Replace if damaged or after any impact.
- Safety Glasses: ANSI Z87.1 compliant safety glasses with side shields. Required for all personnel to protect against dust, debris, and potential impacts.
- High-Visibility Vest: ANSI 107 Class 2 or 3 high-visibility vest. Ensures visibility in all lighting conditions. Must be clean and in good repair.
- Work Gloves: Appropriate work gloves for the task. Inspect for wear and tear before each use.
- Steel-Toed Boots: ANSI Z41 PT99 compliant steel-toed boots. Protects feet from impacts and punctures. Inspect for damage before each use.
Tools and Equipment
- Inspection Checklists: Standardized checklists for specific equipment. Ensure checklists are up-to-date and relevant to the equipment being inspected.
- Measuring Tools: Tape measures, levels, etc., as required for inspection. Verify accuracy before use.
- Communication Devices: Two-way radios or other communication devices. Ensure they are functional and charged for effective communication during inspections and hazard reporting.
Hazard Analysis
Identified Hazards
| Hazard | Risk Level | Potential Consequences |
|---|---|---|
| Equipment Malfunction | Medium | Equipment failure leading to injury or project delays. |
| Slips, Trips, and Falls | Medium | Injuries from slips, trips, or falls due to uneven surfaces, obstacles, or poor housekeeping. |
| Struck-by Hazards | High | Being struck by moving equipment or falling objects. |
| Hazardous Material Exposure | Medium | Exposure to hazardous materials leading to health issues. |
| Inadequate Machine Guarding | High | Injury due to contact with moving parts of machinery. |
Control Measures
- Verify all safety features are functional. Remove defective equipment from service immediately.: Conduct thorough equipment inspections using checklists.
- Ensure walkways are clear, and work areas are organized to prevent slips, trips, and falls.: Maintain good housekeeping practices. [2]
- Use barriers and signage to separate workers from moving equipment.: Implement traffic management plan. [1]
- Provide appropriate PPE and training.: Ensure proper storage and handling of hazardous materials. [3]
- Ensure all moving parts are adequately guarded to prevent contact.: Verify machine guarding is in place and functional. [4]
Emergency Procedures
Emergency Contact Information
- Site Emergency: [Insert Phone Number]
- First Aid: [Insert Phone Number]
- Supervisor: [Insert Phone Number]
Emergency Response Steps
- Immediately stop work and assess the situation.
- Administer first aid if necessary.
- Report the incident to the supervisor.
- Evacuate the area if there is an immediate danger.
Evacuation Routes
Primary evacuation route: [Describe Route]. Secondary evacuation route: [Describe Route].
Designated assembly point: [Describe Location].
Required Permits and Certifications
- Equipment Operator Certification
- Hazardous Materials Handling Certification (if applicable)
Additional Safety Considerations
- Review safety data sheets (SDS) for all chemicals on site.
- Ensure all personnel are trained on the proper use of equipment.
- Regularly inspect and maintain all tools and equipment. [4]
Pre-Task Plan Verification
By signing below, you acknowledge that you have reviewed and understand this pre-task safety plan:
Supervisor: _________________________ Date: __________
Safety Representative: _________________________ Date: __________
Workers:
- Name: _________________________ Signature: _________________________ Date: __________
- Name: _________________________ Signature: _________________________ Date: __________
- Name: _________________________ Signature: _________________________ Date: __________
This pre-task plan must be reviewed and updated if conditions or scope of work changes.
Safety powered by SALUS
Important Safety Note:
Always verify safety information with your organization's specific guidelines and local regulations.