Demolition Work Safety Checklist

Purpose: This checklist is designed to ensure the safety of workers during demolition activities by addressing key safety requirements and procedures.

Instructions: Use this checklist before, during, and after demolition work to ensure all safety measures are in place. Mark each item as complete or incomplete and note any corrective actions needed.

Pre-Demolition Checks

  • Competent Worker in Charge: Ensure a competent worker is designated to oversee the demolition work at all times [1].
  • Survey Structural Integrity: Conduct a survey of the building for structural integrity before starting demolition [2].
  • Remove Hazardous Substances: Ensure all chemical and biological substances are removed from the structure [1].
  • Disconnect Utilities: Confirm all utilities are disconnected and written confirmation is available on-site [1].
  • Remove Glass and Windows: Remove all glass and windows on exterior walls adjacent to public walkways [3].

During Demolition

  • Enclose Materials Chute: Ensure materials chutes at angles greater than 45 degrees are fully enclosed [1].
  • Prevent Entry to Drop Zones: Ensure workers cannot enter areas where materials are dropped or conveyed [1].
  • Use of Explosives: If using explosives, ensure a competent person develops a safe demolition procedure [1].
  • Floor-by-Floor Demolition: Perform demolition floor by floor from the top down if workers are present [3].
  • Secure Structural Members: Ensure structural members being removed are not under stress and are secured [3].

Post-Demolition Checks

  • Stability of Remaining Structures: Ensure no walls or parts of the building are left unstable [3].
  • Debris Accumulation: Prevent accumulation of materials or debris that could cause collapse [3].

Equipment and Environment

  • Location of Equipment: Ensure temporary offices and toolboxes are outside the range of falling materials [1].
  • Ground Stability: Avoid performing demolition work at the base of the machine to prevent instability [2].
  • Safety Distance: Maintain a minimum distance of 10 meters from demolition tools [4].

Personal Protective Equipment (PPE)

  • Wear Required PPE: Ensure all workers wear appropriate protective equipment, including helmets, gloves, and eye protection [4].

Corrective Actions

  • Notes/Comments:
  • Follow-up Actions:

Signature: ______________________
Date: ______________________


Important Safety Note:

Always verify safety information with your organization's specific guidelines and local regulations.

References

Page links are approximate
[1]↑

Occupational Health and Safety Code

Open Document

Page 225

[2]↑

CAT 335 Excavator Operation and Maintenance Manual

Open Document

Page 267

[3]↑

Occupational Health and Safety Code

Open Document

Page 226

[4]↑

CAT 335 Excavator Operation and Maintenance Manual

Open Document

Page 266

  • Terms of Service
  • Privacy Policy
  • Safety powered by SALUS