Create a pre-task plan for scaffold assembly
Generated on: April 17, 2025
Pre-Task Plan: Scaffold Assembly
Date: [DATE] Work Area: [WORK AREA] Task Supervisor: [SUPERVISOR NAME]
1. Task Description
Assembly of tubular welded frame scaffolds, including inspection of components, erection planning, and installation of safety measures.
2. Task Duration
Estimated Start: [START TIME] Estimated Completion: [END TIME]
3. Personnel Involved
- Scaffold Erector
- Safety Officer
- Site Supervisor
4. Task-Specific Hazards and Controls
| Hazard | Risk | Control Measures |
|---|---|---|
| Falls from height | Serious injury or fatality | Use of personal fall arrest systems and guardrails [1]. Ensure all personnel are trained in fall protection [2]. |
| Scaffold collapse | Serious injury or fatality | Ensure scaffold is erected on a firm foundation with base plates and mud sills [3]. Use guys, ties, and braces as per manufacturer's recommendations [3]. |
| Falling objects | Injury to workers below | Install toe boards and debris nets. Ensure tools and materials are secured [2]. |
5. Required PPE for Today's Task
- Hard hats
- Safety harness with lanyard
- Steel-toed boots
6. Tools and Equipment Needed
- Scaffold components
- Wrenches and hammers
- Level and measuring tape
7. Pre-Start Checklist
Area Preparation
- Clear area of debris and obstructions [4].
- Ensure no live power lines are within 10 ft. of the work area [4].
- Verify ground conditions are stable and level [3].
Equipment Checks
- Inspect all scaffold components for damage [5].
- Ensure all fall protection equipment is in good condition [6].
- Verify all tools are in working order.
Communication
- Conduct a safety briefing with all personnel [2].
- Establish hand signals or radio communication for coordination.
8. Task Steps Overview
- Inspect all scaffold components for damage or defects.
- Lay out scaffold components in the assembly area.
- Assemble the base section and ensure it is level and stable.
- Erect the scaffold frame, securing each section with braces.
- Install guardrails and toe boards as the scaffold is built.
9. Emergency Response for This Task
- Fall from scaffold → Call emergency services and provide first aid.
- Scaffold collapse → Evacuate area and call emergency services.
10. Task-Specific Precautions
- Do not overload the scaffold beyond its rated capacity [2].
- Ensure all workers are aware of the maximum intended load [2].
- Avoid working on the scaffold during high winds or storms [7].
Pre-Task Briefing Confirmation
All workers understand the task, associated hazards, and required controls.
Team Lead Initials: [___] Date: [DATE] Time: [TIME]
Safety powered by SALUS
Important Safety Note:
Always verify safety information with your organization's specific guidelines and local regulations.
References
Page links are approximate[2]↑
Rules for the Administration of the Oregon Safe Employment Act (Construction, Division 3, OSHA Oregon)
Open DocumentPage 556
[5]↑
Safety Standards for General Safety and Health Standards (Chaper 296-24 WAC)
Open DocumentPage 377