Pre-Task Plan: Electrical Maintenance
Date: [DATE] Work Area: [WORK AREA] Task Supervisor: [SUPERVISOR NAME]
1. Task Description
Perform maintenance on electrical systems, including inspection, testing, and repair of electrical equipment and components.
2. Task Duration
Estimated Start: [START TIME] Estimated Completion: [END TIME]
3. Personnel Involved
- Electrician
- Electrical Technician
- Safety Officer
4. Task-Specific Hazards and Controls
| Hazard | Risk | Control Measures |
|---|---|---|
| Contact with energized parts | Electric shock or electrocution | De-energize and lockout/tagout equipment before maintenance [1] |
| Working near overhead lines | Electric shock or electrocution | Maintain safe distances and use insulated tools [2] |
| Confined spaces with energized parts | Electric shock or electrocution | Use protective shields and barriers, ensure proper illumination [3] |
5. Required PPE for Today's Task
- Insulated gloves
- Safety goggles
- Hard hat
6. Tools and Equipment Needed
- Multimeter
- Insulated hand tools
- Lockout/tagout kit
7. Pre-Start Checklist
Area Preparation
- Ensure work area is clear of unnecessary personnel
- Verify de-energization of equipment
- Set up barriers around work area
Equipment Checks
- Inspect tools for damage
- Verify calibration of testing equipment
- Check PPE for integrity
Communication
- Confirm communication plan with team
- Establish emergency contact procedures
8. Task Steps Overview
- Verify de-energization and lockout/tagout
- Inspect electrical components for damage
- Perform necessary repairs or replacements
- Test equipment to ensure proper operation
- Re-energize and document completion
9. Emergency Response for This Task
- Electric shock → Call emergency services and administer first aid
- Fire → Use Class C fire extinguisher and evacuate area
10. Task-Specific Precautions
- Avoid using metal ladders near electrical equipment [4]
- Ensure all personnel are clear before re-energizing systems [5]
- Use non-conductive tools and equipment [3]
Pre-Task Briefing Confirmation
All workers understand the task, associated hazards, and required controls.
Team Lead Initials: [___] Date: [DATE] Time: [TIME]
Safety powered by SALUS
Important Safety Note:
Always verify safety information with your organization's specific guidelines and local regulations.
References
Page links are approximate[2]↑
Safety Standards for General Safety and Health Standards (Chaper 296-24 WAC)
Open DocumentPage 482
[3]↑
Safety Standards for General Safety and Health Standards (Chaper 296-24 WAC)
Open DocumentPage 483