Pre-Task Plan: Electrical Wiring Installation
Date: [DATE] Work Area: [WORK AREA] Task Supervisor: [SUPERVISOR NAME]
1. Task Description
Installation of electrical wiring for [SPECIFIC PURPOSE, e.g., new lighting system, equipment hookup].
2. Task Duration
Estimated Start: [START TIME] Estimated Completion: [END TIME]
3. Personnel Involved
- Electrician
- Assistant
- Inspector
4. Task-Specific Hazards and Controls
Hazard | Risk | Control Measures |
---|---|---|
Electrical shock | Electrocution, burns | Verify circuit is de-energized and locked out/tagged out before starting work. Use appropriate PPE, including insulated gloves and tools. Test for absence of voltage before touching any wires [1]. |
Arc flash | Burns, blindness | Wear appropriate arc-rated PPE. Maintain safe distances from energized equipment. Ensure proper grounding [2]. |
Falls from heights | Injury, death | Use appropriate fall protection equipment (e.g., harness, lanyard) when working at heights. Inspect ladders and scaffolds before use. Maintain three points of contact on ladders [3]. |
Hazardous materials (e.g., lead in older wiring) | Exposure, poisoning | Wear appropriate respiratory protection and gloves when handling potentially hazardous materials. Follow proper disposal procedures. Ensure adequate ventilation [4]. |
Confined space entry | Asphyxiation, explosion | Follow confined space entry procedures, including air monitoring and ventilation. Have a trained attendant present [4]. |
Ungrounded circuits or equipment | Electrical shock | Ensure all circuits and equipment are properly grounded [2]. |
5. Required PPE for Today's Task
- Hard hat
- Safety glasses
- Insulated gloves
- Arc-rated clothing (if applicable)
- Safety footwear
6. Tools and Equipment Needed
- Voltage tester
- Insulated tools
- Wire strippers/crimpers
- Multimeter
- Ladder/scaffold
7. Pre-Start Checklist
Area Preparation
- Ensure adequate lighting in the work area.
- Clear any obstructions or tripping hazards.
- Establish a safe work zone with proper signage.
Equipment Checks
- Inspect all tools and equipment for damage before use.
- Verify voltage tester is functioning correctly.
- Ensure ladder/scaffold is stable and properly set up.
Communication
- Review task-specific hazards and controls with all personnel.
- Establish clear communication signals and procedures.
- Confirm emergency contact information is readily available.
8. Task Steps Overview
- De-energize and lockout/tagout the circuit.
- Verify absence of voltage.
- Install wiring according to specifications and codes.
- Test wiring for continuity and proper grounding.
- Energize the circuit and verify proper operation.
9. Emergency Response for This Task
- Electrical shock → Immediately de-energize the circuit and administer first aid/CPR. Call emergency services.
- Fall from height → Stabilize the injured worker and call for medical assistance. Ensure the area is safe before approaching.
10. Task-Specific Precautions
- Never work on energized circuits unless absolutely necessary and with proper precautions.
- Use only approved tools and equipment for electrical work.
- Follow all applicable electrical codes and safety standards.
Pre-Task Briefing Confirmation
All workers understand the task, associated hazards, and required controls.
Team Lead Initials: [___] Date: [DATE] Time: [TIME]
Safety powered by SALUS
Important Safety Note:
Always verify safety information with your organization's specific guidelines and local regulations.
References
Page links are approximate[1]↑
Rules for the Administration of the Oregon Safe Employment Act (Construction, Division 3, OSHA Oregon)
Open DocumentPage 472
[2]↑
Safety Standards for General Safety and Health Standards (Chaper 296-24 WAC)
Open DocumentPage 443
[3]↑
Rules for the Administration of the Oregon Safe Employment Act (Construction, Division 3, OSHA Oregon)
Open DocumentPage 457
[4]↑
Safety Standards for General Safety and Health Standards (Chaper 296-24 WAC)
Open DocumentPage 467