Create a pre-task plan for scaffold assembly
Generated on: June 25, 2025
🇺🇸 United States - Texas
We use your location to find the most relevant safety documents and regulations specific to your jurisdiction.
Pre-Task Plan: Scaffold Assembly
Date: [DATE] Work Area: [WORK AREA] Task Supervisor: [SUPERVISOR NAME]
1. Task Description
Erecting a scaffold system for [SPECIFIC PURPOSE, e.g., building maintenance] at the designated work area. This includes assembling frames, installing planks, and ensuring proper fall protection measures are in place.
2. Task Duration
Estimated Start: [START TIME] Estimated Completion: [END TIME]
3. Personnel Involved
- [ROLE 1]: Scaffold Builder
- [ROLE 2]: Safety Observer
- [ROLE 3]: Material Handler
4. Task-Specific Hazards and Controls
| Hazard | Risk | Control Measures |
|---|---|---|
| Falls from height | Serious injury or death | Use personal fall arrest systems (PFAS) including full body harnesses and lanyards attached to a secure anchorage point 4, 7. Ensure guardrails are installed on all open sides and ends of the scaffold 2, 7. |
| Unstable scaffold | Scaffold collapse, leading to injury | Ensure the scaffold is erected on a level, firm foundation with base plates and mud sills [1]. Brace the scaffold to prevent swaying and displacement, especially if the height-to-base ratio exceeds 4:1 [1]. |
| Struck by falling objects | Head injury, cuts, bruises | Establish a controlled access zone below the scaffold. Use toeboards, screens, or debris nets to prevent tools and materials from falling 2, 13. All personnel must wear hardhats [2]. Use tag lines when hoisting materials [3]. |
| Electrical hazards | Electrocution | Maintain a safe clearance from power lines [4]. If working near power lines is unavoidable, contact the utility company to de-energize or insulate the lines [4]. Use GFCI with power tools [5]. |
| Scaffold component failure | Scaffold collapse | Inspect all scaffold components before use for damage or defects 1, 2, 9. Do not use damaged or weakened components. Ensure components are properly rated for the intended load 2, 9. |
| Improper access | Falls during access/egress | Use safe access methods such as ladders, stair towers, or ramps [6]. Do not use cross braces for access [6]. Ensure ladders are properly secured and extend at least 3 feet above the landing [6]. |
| Overloading the scaffold | Scaffold collapse | Do not exceed the maximum intended load or rated capacity of the scaffold 2, 9. Distribute the load evenly on the platform [4]. |
| Adverse weather conditions | Falls, instability | Do not work on scaffolds during storms or high winds unless a competent person determines it is safe and employees are protected by a personal fall arrest system or wind screens 2, 20. Remove ice and snow from the scaffold platform [3]. |
5. Required PPE for Today's Task
6. Tools and Equipment Needed
- Scaffold frames, braces, and planks
- Adjustable wrenches
- Level
- Tag lines [3]
- Personal Fall Arrest Systems (PFAS)
7. Pre-Start Checklist
Area Preparation
- Inspect the work area for hazards such as overhead power lines and obstructions 1, 3.
- Ensure the ground is level and stable for scaffold erection [1].
- Establish a controlled access zone to prevent unauthorized entry [2].
Equipment Checks
- Inspect all scaffold components for damage or defects 1, 2, 9.
- Verify that all PFAS equipment is in good working condition and properly inspected 4, 18.
- Ensure that all tools and equipment are in safe operating condition.
Communication
- Conduct a pre-task briefing to discuss the task, hazards, and controls 1, 3.
- Establish clear communication signals between workers.
- Review emergency procedures and contact information.
8. Task Steps Overview
- Set up base plates and mud sills on a level surface [1].
- Erect scaffold frames and install cross braces [8].
- Install scaffold planks, ensuring they are properly secured and extend over supports [9].
- Install guardrails, midrails, and toeboards on all open sides of the scaffold 2, 7, 16.
- Inspect the completed scaffold for stability and safety before use 1, 2, 9.
9. Emergency Response for This Task
- Fall from height → Activate emergency services (911). Provide first aid and ensure the injured worker receives medical attention.
- Scaffold collapse → Evacuate the area and account for all personnel. Investigate the cause of the collapse before resuming work.
- Electrical contact → Shut off power if safe to do so. Administer first aid and call for emergency medical assistance.
10. Task-Specific Precautions
- Never overload the scaffold 1, 2, 9.
- Always use fall protection when working at heights 4, 7, 16.
- Keep the work area clean and free of debris 2, 20.
Pre-Task Briefing Confirmation
All workers understand the task, associated hazards, and required controls.
Team Lead Initials: [___] Date: [DATE] Time: [TIME]
Safety powered by SALUS
Important Safety Note:
Always verify safety information with your organization's specific guidelines and local regulations.