Create a pre-task plan for scaffold assembly
Generated on: April 27, 2025
Pre-Task Plan: Scaffold Assembly
Date: [DATE] Work Area: [WORK AREA] Task Supervisor: [SUPERVISOR NAME]
1. Task Description
Assembly of tubular welded frame scaffolds, including inspection of components, erection, and securing of the scaffold structure.
2. Task Duration
Estimated Start: [START TIME] Estimated Completion: [END TIME]
3. Personnel Involved
- Scaffold Erector
- Safety Officer
- Site Supervisor
4. Task-Specific Hazards and Controls
| Hazard | Risk | Control Measures |
|---|---|---|
| Falls from height | Serious injury or fatality | Use of personal fall arrest systems and guardrails [1]. Ensure all personnel are trained in fall protection [2]. |
| Scaffold collapse | Serious injury or fatality | Ensure scaffold is erected on a stable foundation and secured with guys, ties, and braces [3]. Conduct pre-use inspection by a competent person [4]. |
| Falling objects | Injury to workers below | Install toe boards and debris nets. Ensure tools and materials are secured [5]. |
5. Required PPE for Today's Task
- Hard hats
- Safety harnesses with lanyards
- Steel-toed boots
6. Tools and Equipment Needed
- Scaffold components
- Wrenches and hammers
- Safety harnesses and lanyards
7. Pre-Start Checklist
Area Preparation
- Clear the work area of debris and obstructions.
- Ensure the ground is level and stable.
- Mark the work area with safety signs.
Equipment Checks
- Inspect all scaffold components for damage or defects [6].
- Verify all fall protection equipment is in good condition [7].
- Ensure all tools are in working order.
Communication
- Conduct a safety briefing with all personnel.
- Establish clear hand signals for communication.
8. Task Steps Overview
- Inspect all scaffold components for damage.
- Assemble the base section of the scaffold on a stable foundation.
- Secure the scaffold with guys, ties, and braces.
- Install guardrails and toe boards.
- Conduct a final inspection before use.
9. Emergency Response for This Task
- Fall from height → Call emergency services and provide first aid.
- Scaffold collapse → Evacuate the area and call emergency services.
10. Task-Specific Precautions
- Do not work on scaffolds during high winds or storms [5].
- Ensure all personnel are trained and competent [2].
- Regularly inspect the scaffold during use for any signs of instability.
Pre-Task Briefing Confirmation
All workers understand the task, associated hazards, and required controls.
Team Lead Initials: [___] Date: [DATE] Time: [TIME]
Safety powered by SALUS
Important Safety Note:
Always verify safety information with your organization's specific guidelines and local regulations.
References
Page links are approximate[2]↑
Rules for the Administration of the Oregon Safe Employment Act (Construction, Division 3, OSHA Oregon)
Open DocumentPage 556
[4]↑
Rules for the Administration of the Oregon Safe Employment Act (Construction, Division 3, OSHA Oregon)
Open DocumentPage 533