Safety Assistant
Powered by SALUSIQ
RESEARCH

Create a pre-task plan for scaffold assembly

Generated on: April 27, 2025

Pre-Task Plan: Scaffold Assembly

Date: [DATE] Work Area: [WORK AREA] Task Supervisor: [SUPERVISOR NAME]

1. Task Description

Assembly of tubular welded frame scaffolds, including inspection of components, erection, and securing of the scaffold structure.

2. Task Duration

Estimated Start: [START TIME] Estimated Completion: [END TIME]

3. Personnel Involved

  • Scaffold Erector
  • Safety Officer
  • Site Supervisor

4. Task-Specific Hazards and Controls

HazardRiskControl Measures
Falls from heightSerious injury or fatalityUse of personal fall arrest systems and guardrails [1]. Ensure all personnel are trained in fall protection [2].
Scaffold collapseSerious injury or fatalityEnsure scaffold is erected on a stable foundation and secured with guys, ties, and braces [3]. Conduct pre-use inspection by a competent person [4].
Falling objectsInjury to workers belowInstall toe boards and debris nets. Ensure tools and materials are secured [5].

5. Required PPE for Today's Task

  • Hard hats
  • Safety harnesses with lanyards
  • Steel-toed boots

6. Tools and Equipment Needed

  • Scaffold components
  • Wrenches and hammers
  • Safety harnesses and lanyards

7. Pre-Start Checklist

Area Preparation

  • Clear the work area of debris and obstructions.
  • Ensure the ground is level and stable.
  • Mark the work area with safety signs.

Equipment Checks

  • Inspect all scaffold components for damage or defects [6].
  • Verify all fall protection equipment is in good condition [7].
  • Ensure all tools are in working order.

Communication

  • Conduct a safety briefing with all personnel.
  • Establish clear hand signals for communication.

8. Task Steps Overview

  1. Inspect all scaffold components for damage.
  2. Assemble the base section of the scaffold on a stable foundation.
  3. Secure the scaffold with guys, ties, and braces.
  4. Install guardrails and toe boards.
  5. Conduct a final inspection before use.

9. Emergency Response for This Task

  • Fall from height → Call emergency services and provide first aid.
  • Scaffold collapse → Evacuate the area and call emergency services.

10. Task-Specific Precautions

  • Do not work on scaffolds during high winds or storms [5].
  • Ensure all personnel are trained and competent [2].
  • Regularly inspect the scaffold during use for any signs of instability.

Pre-Task Briefing Confirmation

All workers understand the task, associated hazards, and required controls.

Team Lead Initials: [___] Date: [DATE] Time: [TIME]

Safety powered by SALUS


Important Safety Note:

Always verify safety information with your organization's specific guidelines and local regulations.

References

Page links are approximate
[1]↑

Safety and Health Regulations for Construction (OSHA)

Open Document

Page 76

[2]↑

Rules for the Administration of the Oregon Safe Employment Act (Construction, Division 3, OSHA Oregon)

Open Document

Page 556

[3]↑

Safety and Health Regulations for Construction (OSHA)

Open Document

Page 67

[4]↑

Rules for the Administration of the Oregon Safe Employment Act (Construction, Division 3, OSHA Oregon)

Open Document

Page 533

[5]↑

Safety and Health Regulations for Construction (OSHA)

Open Document

Page 75

[6]↑

Occupational Health and Safety Regulations, 2020 (Sask. Reg. 10/2020)

Open Document

Page 98

[7]↑

Spider by Brand Safway: Swing Stage Operator’s Manual

Open Document

Page 20

AI Safety Tools

  • Toolbox Talks
  • Pre-Task Plans
  • Risk Assessments
  • Safe Work Procedures
  • Safety Checklists

Company

  • About
  • Contact
  • Terms of Service
  • Privacy Policy

© 2026 SALUS Safety. All rights reserved.

< for the nerds />
Assistant
History
DocumentsLabs