[PRE TASK PLAN TITLE]
Project: [PROJECT NAME]
Date: 2026-01-09
Location: [LOCATION]
Supervisor: [SUPERVISOR NAME]
Task Overview
Conduct a daily safety briefing covering equipment inspection procedures and permit-to-work requirements.
Expected Duration: 30 minutes
Number of Workers: All site personnel
Required PPE and Equipment
Personal Protective Equipment
- Hard Hat: ANSI Z89.1 Type I or Type II compliant hard hat. Inspect for cracks, dents, or damage before each use. Replace if damaged or after any impact.
- Safety Glasses: ANSI Z87.1 compliant safety glasses with side shields. Protects eyes from dust, debris, and potential impacts. Ensure proper fit and clean regularly.
- High-Visibility Vest: ANSI/ISEA 107-2015 Class 2 or 3 high-visibility vest. Enhances visibility in all lighting conditions, especially around moving equipment and traffic.
- Work Gloves: Appropriate work gloves for the task (e.g., leather, nitrile-coated). Protect hands from cuts, abrasions, and chemical exposure. Inspect for wear and tear before each use.
- Steel-Toed Boots: ANSI Z41 PT99 compliant steel-toed boots. Protect feet from impacts and crushing hazards. Inspect for damage before each use.
Tools and Equipment
- Inspection Checklists: Daily inspection checklists for relevant equipment (e.g., forklifts, vehicles, machinery). Ensure checklists are task-specific and up-to-date.
- Permit-to-Work Forms: Relevant permit-to-work forms for specific tasks (e.g., energized electrical work, confined space entry). Ensure forms are readily available and properly filled out.
- Communication Devices: Two-way radios or other communication devices to maintain contact during briefings and throughout the workday.
Hazard Analysis
Identified Hazards
| Hazard | Risk Level | Potential Consequences |
|---|---|---|
| Failure to identify equipment defects during inspections. | Medium | Equipment malfunction, leading to accidents, injuries, or property damage. |
| Inadequate understanding of permit-to-work requirements. | Medium | Unauthorized work, increased risk of incidents, and non-compliance with safety regulations. |
| Lack of awareness of changing site conditions. | Medium | Exposure to new or unforeseen hazards, increasing the risk of accidents and injuries. |
| Communication breakdown during the briefing. | Low | Misunderstanding of safety procedures, leading to errors and potential incidents. |
| Slips, trips, and falls during the briefing due to uneven ground or obstructions. | Low | Minor to moderate injuries, such as sprains, strains, or fractures. |
Control Measures
- Ensure all equipment operators are trained on the inspection procedure and understand how to identify and report defects.: Implement a standardized equipment inspection procedure using daily checklists. [2]
- Provide clear explanations of each step in the permit process and emphasize the importance of obtaining proper authorization before starting work.: Review permit-to-work requirements and ensure all personnel understand the process. [3]
- Encourage open communication and feedback from all personnel regarding potential hazards.: Communicate any changes in site conditions or new hazards identified since the last briefing. [1]
- Use visual aids, ask clarifying questions, and encourage active participation from all attendees.: Ensure clear and concise communication during the briefing. [1]
- Remove any obstructions, ensure adequate lighting, and provide a stable surface for standing or sitting.: Maintain a clean and organized briefing area. [4]
Emergency Procedures
Emergency Contact Information
- Site Emergency: [Insert Phone Number]
- First Aid: [Insert Phone Number]
- Supervisor: [Insert Phone Number]
Emergency Response Steps
- In case of an equipment malfunction, immediately shut down the equipment and report the issue to the supervisor.
- If a permit-to-work violation is observed, stop the work immediately and notify the supervisor.
- In the event of an injury, provide first aid and contact emergency services if necessary.
- If a fire or other serious hazard is identified, evacuate the area immediately and follow the site's emergency evacuation plan.
Evacuation Routes
Primary evacuation route: [Insert Route Description]. Secondary evacuation route: [Insert Route Description].
Emergency assembly point: [Insert Location].
Required Permits and Certifications
- Equipment Operator Certification (if applicable)
- Confined Space Entry Permit (if applicable)
- Energized Electrical Work Permit (if applicable) [3]
Additional Safety Considerations
- Ensure all attendees sign an attendance sheet to document participation in the briefing.
- Review any near-miss incidents or accidents that have occurred since the last briefing.
- Encourage workers to actively participate and ask questions during the briefing.
Pre-Task Plan Verification
By signing below, you acknowledge that you have reviewed and understand this pre-task safety plan:
Supervisor: _________________________ Date: __________
Safety Representative: _________________________ Date: __________
Workers:
- Name: _________________________ Signature: _________________________ Date: __________
- Name: _________________________ Signature: _________________________ Date: __________
- Name: _________________________ Signature: _________________________ Date: __________
This pre-task plan must be reviewed and updated if conditions or scope of work changes.
Safety powered by SALUS
Important Safety Note:
Always verify safety information with your organization's specific guidelines and local regulations.