Sign installation
Generated on: June 29, 2025
Pre-Task Plan: Sign Installation
Date: [DATE] Work Area: [WORK AREA] Task Supervisor: [SUPERVISOR NAME]
1. Task Description
Installation of [NUMBER] signs at [LOCATION] using [TOOLS/EQUIPMENT].
2. Task Duration
Estimated Start: [START TIME] Estimated Completion: [END TIME]
3. Personnel Involved
- Sign Installer
- Assistant
4. Task-Specific Hazards and Controls
Hazard | Risk | Control Measures |
---|---|---|
Eye Contact with materials | Serious eye irritation 1, 2, 3, 5, 6, 8, 9, 11, 12, 13, 14, 15, 16, 17, 18 | Immediately flush eyes with plenty of water for at least 15 minutes. Remove contact lenses, if present and easy to do. Get medical attention immediately [1]. |
Skin Contact with materials | Skin irritation, dryness, discomfort, and dermatitis 1, 2, 3, 5, 6, 8, 9, 11, 12, 13, 14, 15, 16, 17, 18 | Immediately flush skin with plenty of soap and water. For minor skin contact, avoid spreading material on unaffected skin. If skin irritation or rash occurs: get medical attention/advice. Take off contaminated clothing and wash before reuse [1]. |
Inhalation of dust/vapors | Respiratory tract irritation 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19 | If breathing is difficult, remove victim to fresh air and keep at rest in a position comfortable for breathing. Get medical advice/attention if you feel unwell 1, 2, 3, 5, 6, 8, 9, 11, 12, 13, 14, 15, 16, 17, 18, 19. Use only outdoors or in a well ventilated area [2]. |
Manual Handling | Musculoskeletal injuries | Use proper lifting techniques. Get assistance for heavy items. |
Working at Height | Falls resulting in injury | Use fall protection equipment (harness, lanyard). Ensure scaffolding/ladders are stable. |
5. Required PPE for Today's Task
- Safety Glasses
- Gloves
- Hard Hat
- Safety Boots
6. Tools and Equipment Needed
- Drill
- Screwdrivers
- Level
- Measuring Tape
- Ladder/Scaffolding
7. Pre-Start Checklist
Area Preparation
- Clear the work area of obstructions.
- Ensure adequate lighting.
- Barricade the work area to prevent unauthorized access.
Equipment Checks
- Inspect ladder/scaffolding for stability and defects.
- Check power tools for proper function and grounding.
- Verify all tools are in good working condition.
Communication
- Review task steps and potential hazards with all team members.
- Establish hand signals for communication at height.
8. Task Steps Overview
- Measure and mark sign location.
- Prepare mounting surface (e.g., drilling holes).
- Install mounting hardware.
- Attach sign to hardware.
- Level and secure the sign.
9. Emergency Response for This Task
- Eye Contact → Flush eyes with water for 15 minutes, seek medical attention 1, 2, 3, 5, 6, 8, 9, 11, 12, 13, 14, 15, 16, 17, 18.
- Fall from Height → Activate emergency response system, provide first aid.
10. Task-Specific Precautions
- Be aware of surroundings and potential overhead hazards.
- Use caution when working near edges or openings.
- Ensure proper ventilation when using adhesives or sealants.
Pre-Task Briefing Confirmation
All workers understand the task, associated hazards, and required controls.
Team Lead Initials: [___] Date: [DATE] Time: [TIME]
Safety powered by SALUS
Important Safety Note:
Always verify safety information with your organization's specific guidelines and local regulations.