Hanging pipe
Generated on: May 29, 2025
Pre-Task Plan: Hanging Pipe
Date: [DATE] Work Area: [WORK AREA] Task Supervisor: [SUPERVISOR NAME]
1. Task Description
Hanging and securing pipes in the designated area [1].
2. Task Duration
Estimated Start: [START TIME] Estimated Completion: [END TIME]
3. Personnel Involved
- [ROLE 1]
- [ROLE 2]
- [ROLE 3]
4. Task-Specific Hazards and Controls
Hazard | Risk | Control Measures |
---|---|---|
Falling pipes | Injury to personnel | Ensure pipes are secured to prevent falling [1]. |
Improper lifting | Strains, sprains, or musculoskeletal injuries | Use proper lifting techniques and equipment. Ensure team lifting when necessary. |
Unguarded edges or openings | Falls | Ensure platforms and stairways are installed and secure [2]. |
Impact from moving equipment | Injury to personnel | Establish and communicate clear traffic patterns. Use spotters when operating equipment in close proximity to workers. |
5. Required PPE for Today's Task
- Hard hat
- Safety glasses
- Gloves
- Steel-toed boots
6. Tools and Equipment Needed
- Lifting straps or slings
- Tag lines
- Wrenches
- Level
7. Pre-Start Checklist
Area Preparation
- Clear the work area of obstructions.
- Ensure adequate lighting.
- Barricade or flag off the area to prevent unauthorized entry.
Equipment Checks
- Inspect lifting equipment for defects.
- Verify the load rating of lifting equipment.
- Ensure tools are in good working condition.
Communication
- Review task steps and potential hazards with all personnel.
- Establish hand signals for communication during lifting operations.
8. Task Steps Overview
- Inspect pipes for any defects.
- Prepare the hanging location.
- Attach lifting straps or slings to the pipe.
- Lift the pipe into position.
- Secure the pipe in place.
9. Emergency Response for This Task
- Pipe falling → Clear the area and assess injuries.
- Injury during lifting → Provide first aid and call for medical assistance.
10. Task-Specific Precautions
- Never walk or work under a suspended load.
- Use tag lines to control the movement of pipes.
- Ensure all workers are positioned safely before hoisting [1].
Pre-Task Briefing Confirmation
All workers understand the task, associated hazards, and required controls.
Team Lead Initials: [___] Date: [DATE] Time: [TIME]